Similar Projects
Water Main Replacement: Eldorado/Seville - W2 -18 - Village of Bellevue
Infrastructure
Conception
$650,000 CJ est. value
Bellevue, WI 54302

Josten North East Restrooms/Pavilion - LS19 - Village of Bellevue
New Construction, Infrastructure
Conception
$386,640 CJ est. value
Green Bay, WI 54311

West Mason Street, City of Green Bay - Traffic Signals / Upgrades
Infrastructure
Design
$2,000,000 CJ est. value
Green Bay, WI 54304

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Bridge 2-23 (Atkinson Drive Over Cn Wc Railroad B-5-225 Painting
Infrastructure
Bidding
$500,000 CJ est. value
Green Bay, WI 54301

Bridge 3-23 (Main Street Bridge B-5-141 Expansion Joint Reconstruction)
Demolition, New Construction, Infrastructure
Bidding
$700,000 CJ est. value
Green Bay, WI 54301

Construction at Green Bay Austin Straubel International Airport - Rehabilitate Runway 18/36 and Dutchman Creek Culverts
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Green Bay, WI 54313

De Pere High School - Tennis Court Site Development
Infrastructure
Post-Bid
De Pere, WI 54115

Pond and Drainage System Construction
Infrastructure
Results
$264,024 CJ est. value
De Pere, WI 54115

Alley Reconstruction
Infrastructure
Results
$663,465 CJ est. value
De Pere, WI 54115

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Sewers 1-22 Basin Repairs
Infrastructure
Construction
$1,086,000 CJ est. value
Green Bay, WI 54301

University Heights at Baird Creek
New Construction, Infrastructure
Pending Verification
$24,600,000 CJ est. value
Green Bay, WI 54311

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Oak Park Drive Streambank Stabilization - ST26-01 - Village Of Bellevue
Infrastructure
Conception
$323,000 CJ est. value
Bellevue, WI 54311

Last Updated 06/22/2023 01:12 PM
Project Title

New Water GBF North Plant Clarifier Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54302   (Brown County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $34,314,529 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bid on the following project: Improvements to the North Plant Primary Clarifiers, including but not limited to: o Mechanism Replacement o Corner Sweep Replacement o Drive Replacement o Scum Collection System Replacement o Launder Replacement o Scum Well Crack Repair o Structure Expansion Joint Repair o New Platform at Primary Clarifiers o New Clarifier Floor Grout Topping o Recoating of Large Diameter Inlet Piping o Sludge Pump Replacement (including piping and valves) o Influent Gate Replacement o Other miscellaneous piping and valves o Associated Electrical, I&C, HVAC & Civil work. Improvements to the North Plant Final Clarifiers, including but not limited to: o Mechanism Replacement o Corner Sweep Replacement o Drive Replacement o New Energy-Dissipating Inlet o Scum Collection System Replacement o Launder Replacement o Shade covers for launders o Density Current Baffles o Structure Expansion Joint Repair o New Clarifier Floor Grout Topping o Scum Pump Replacement (including piping and valves) o Service Water Pipe Replacement o Scum baffles o Other miscellaneous piping and valves o Associated Electrical, I&C, HVAC & Civil work. The project also includes improvements to the concrete decking around the North Plant Primary Clarifiers, Aeration Basins and Final Clarifiers as well as structural repairs inside interconnecting tunnels. Pre-Qualification: Yes Questions regarding the Prequalification documents should be directed to Donohue & Associates attention: Kim Gahagan, PE (Telephone 920-803-7310, email kgahagan@donohue-associates.com).

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents