Similar Projects
Surfwood Subdivision Roadway and Drainage Improvements
Infrastructure
Design
$1,796,345 CJ est. value
Saint Augustine Beach, FL 32084

Safe Route to School (SRTS) Infrastructure Priority 3 - Coral Reef, Howard Drive, Perrine Elementary Schools
Infrastructure
Design
$710,000 CJ est. value
Palmetto Bay, FL 33157

Add Auxiliary Lane(s)/Milling and Resurfacing/Lighting/Roadway Signing
Infrastructure
Bidding
$15,787,826 CJ est. value
Sunrise, FL 33321

Lake Ashby Park Pier Replacement
Infrastructure
Bidding
$450,000 CJ est. value
New Smyrna Beach, FL 32168

Concrete
Term Contract
Sub-Bidding
Saint Augustine Beach, FL 32084

Demolition, Concrete Replacement, Concrete Remediation Work
Renovation
Sub-Bidding
$175,000 CJ est. value
Fort Pierce, FL 34950

FDOT Type C Stormwater Concrete Inlet Structures
Post-Bid
Tampa, FL

Annual Ready Mix Concrete
Term Contract
Post-Bid
Gainesville, FL 32601

Region 4,GSA PBS, Design-Build Concrete and Crack Water Fountain Repairs, Fort Lauderdale, FL
Results
$500,000 to $1,000,000 est. value
Fort Lauderdale, FL 33301

CONS-CONCRETE/2021 - Citywide Concrete Construction Services
Results
Punta Gorda, FL

Improvements to Miramar Boulevard at Buttonwood Avenue
Infrastructure
Bidding
$600,000 CJ est. value
Miramar, FL 33025

Asphalt Concrete (Hot Mix)
Term Contract
Post-Bid
Brooksville, FL 34601

Rehabilitate Underdeck Concrete - Phase 4
Results
Less than $2,500,000 est. value
Jacksonville, FL 32099

R and R Minor Bridges
Infrastructure
Bidding
$616,814 CJ est. value
Miami, FL 33134

Eastern Shipbuilding Concrete Slab
Infrastructure
Post-Bid
Port Saint Joe, FL 32456

Last Updated 08/30/2022 01:10 PM
Project Title

PHCD Vacant Unit Preparations 2022 - North Area

Physical Address View project details and contacts
City, State (County) Miami, FL 33132   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this Contract is to prepare selected vacant units throughout PHCD for occupancy. Vendor will be bidding to complete (Move-In Ready) vacant units, varying from 0br,1br, 2br, 3br,4br, & 5br. The locations are attached at the Form Of Bid Section of the Bid packet. Work shall be done in an expedited manner. Work duration will be 90 calendar days to complete all vacant unit's repairs. Contractors must have the labor force capacity to complete the project timely. The following are, at a minimum, the steps to preparing a vacant unit: Contractor shall be responsible for any initial clearing / cleaning of any vacant unit prior to the preparations. the Contractor will be responsible for getting their own bulk trash dumpster (40 yarder) for the debris from the units placed at an agreed spot on any property belonging to PHCD between the Maintenance Supervisor and or the Site Manager and the contractors representative. Dumpster must be cleared out once the dumpster has reached its maximum level to avoid any fines. Vendor shall be responsible for any dumping fines if it pertains to the dumpster that was rented by the contractor, no exceptions. Pre-Clean entire unit thoroughly with water & disinfectant cleaner (i.e. bathroom area, kitchen cabinets / area, windows and sills, light fixtures and globes and outlets and switches, water-heater and closet) Work to Be Performed (Includes): Carpentry, Plumbing, Electrical systems, Plaster, Paint, Final Cleaning. Please see constructions document for the full scope of work. Contractors shall provide separate money orders or cashier's checks per contracts. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.

Details

Single-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents