Similar Projects
Inova Hospital
New Construction - 4,000,000 SF
Conception
$1,000,000,000 est. value
Alexandria, VA 22304

Oakville Triangle Development
New Construction, Build-Out - 470,000 SF
Conception
Alexandria, VA 22314

2400 Columbia Pike Mixed Use Development
New Construction - 131,083 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Arlington, VA 22204

1200 North Henry Development
New Construction, Demolition - 140,493 SF
Design
$55,000,000 est. value
Alexandria, VA

Emily Couric Clinical Cancer Center for New Treatment Modality
New Construction
Bidding
Charlottesville, VA 22903

Emmet/Ivy Parking Garage 2021 Repair and Preventive Maintenance (Academic On-Demand Construction
Renovation
Bidding
Charlottesville, VA

Church & Market Apartments
New Construction, Build-Out - 202,800 SF
Sub-Bidding
$40,000,000 est. value
Leesburg, VA 20176

VCU Health System Critical Care Hospital Sterile Processing Department Renovation Phases 2 and 3
Renovation - 4,675 SF
Post-Bid
Less than $1,000,000 est. value
Richmond, VA 23298

VCU Health System Critical Care Hospital Sterile Processing Department Renovation Phases 2 and 3
Renovation - 4,675 SF
Post-Bid
Less than $1,000,000 est. value
Richmond, VA 23298

Z2DA--P.E.T. Holding Space Nuclear Medicine Project #652-16-908
New Construction, Renovation, Demolition
Results
$100,000 to $250,000 est. value
Richmond, VA 23249

Z--LINAC Vaults 1 & 2 Modifications Fy19 (Va-19-00023131) Project 652-16-107
Renovation
Results
$500,000 to $1,000,000 est. value
Richmond, VA 23249

Springfield Community Business Center Commuter Parking Garage
New Construction - 418,042 SF
Construction
$40,000,000 to $50,000,000 est. value
Springfield, VA

Liberty Place
New Construction, Build-Out, Demolition - 86,000 SF
Construction
$26,000,000 est. value
Fredericksburg, VA 22401

GMU Expansion - Institute for Digital Innovation
New Construction - 400,000 SF
Pending Verification
$250,000,000 est. value
Arlington, VA 22201

Reston Heights
New Construction, Build-Out - 8,000 SF
Pending Verification
Reston, VA 20191

Last Updated 08/31/2021 12:31 PM
Project Title

EVMS Campus Master Planner

Physical Address View project details and contacts
City, State (County) State-Wide: VA
Category(s) Heavy and Highway, Medical
Sub-Category(s) Hospital, Parking Garage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

The Medical Center Master Plan should provide a conceptual layout to guide future growth and development of the center. The development plan should use a broad based representation considering the following key issues: A. Site Conditions A detailed analysis of the physical characteristics of EVMC. This should include but not be limited to: • Size • Natural resources • Location • Land ownership • Boundaries • Adjoin land uses • Topography • Sea level rise and flood risk B. Future Space and Facility Needs A major portion of the master planning process will be a comprehensive analysis of the future space and facility needs. Data and information from Children’s Hospital of the Kings Daughters (CHKD), EVMS and Sentara Norfolk General Hospital will provide a basis for development of alternatives and recommendations for the development of EVMC’s Master Plan. This should include but not be limited to: • Growth • Space programming • Program changes • Parking • Administrative support • Transportation • Academic support • Existing conditions C. Recommendations: Plan concepts are developed that will provide criteria and guidelines for improvement and facilities development that supports the EVMC mission, future development, growth, additional building needs and requirements, layout of the Medical Center Campus. This 7 should include the long-term viability of the campus and future sea level rise and flood mitigation. Additionally, the master plan should include current and future parking needs for the Medical Center, based on the current needs and planned future growth. This plan will need to include an estimate timeframe for the need for additional parking, site selection (options), and size requirements for future parking needs. The Medical Center Master Plan developed will need to include any requirements and be approved by The City of Norfolk

Details

Hospital, New Construction, Parking Garage, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents