Similar Projects
Bratcher Street Tank Rehabilitation
Infrastructure
Bidding
McEwen, TN 37101

Brentwood Equalization Facility No. 1
Infrastructure
Bidding
Brentwood, TN

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Bristol WTP Washwater Tank Painting & Improvements
Results
Bristol, TN

Overhead Storage Tank Painting
Renovation
Results
Memphis, TN 38103

Contact Time Basin
Post-Bid
Luttrell, TN 37779

Industrial Park Water Storage Tank Rehabilitation
Results
$86,000 est. value
Woodbury, TN 37190

Water Storage Tank Rehabilitation
Post-Bid
Clarksville, TN

Moores Lane Water Tank Repairs
Post-Bid
Franklin, TN 37067

Interior Maintenance Water Mixing System
Post-Bid
Rogersville, TN

West Hills Tank Repairing/Repainting
Post-Bid
Johnson City, TN

Interstate Drive Tank Recoating
Infrastructure
Post-Bid
Crossville, TN

Hartsville Pike Water Storage Tank
Infrastructure
Post-Bid
$165,000,000 est. value
Gallatin, TN

Last Updated 07/29/2021 12:19 PM
Project Title

Maintenance of Regulated Underground Storage Tanks (Fuel) University of Tennessee Health Science Center (Memphis Campus) Facilities Administration Physical Plant

Physical Address View project details and contacts
City, State (County) Memphis, TN 38103   (Shelby County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The preventive maintenance program for underground storage tanks (USTs) shall consist of periodic inspection and cleaning of the underground stored fuel. Fuel Cleaning - Once per year, the contents of each UST shall be filtered to remove any water, sediment, gums, algae and oxidized fuel. After the work, the condition of the fuel will be available to be used having no restrictions. Following the first such inspection, subsequent yearly inspections shall fall within two weeks of the calendar date of the first inspection.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents