Similar Projects
Campground Development - 459-054 - City of Sioux City
Infrastructure
Conception
$2,550,000 CJ est. value
Sioux City, IA 51101

Leeds Connector - 459-320 - City of Sioux City
Infrastructure
Conception
$250,000 CJ est. value
Sioux City, IA 51101

18th Street Viaduct - 719-071 - City of Sioux City
New Construction, Infrastructure
Design
$800,000 CJ est. value
Sioux City, IA 51105

18th Street Viaduct - 719-071 - City of Sioux City
New Construction, Infrastructure
Design
$800,000 CJ est. value
Sioux City, IA 51105

IBP Ice Center - Locker Room Addition Project
Addition, Demolition, Infrastructure
Bidding
$11,700,000 CJ est. value
Sioux City, IA 51106

29th Street Reconstruction (Jones Street to Cheyenne Boulevard)
Infrastructure
Post-Bid
$6,150,000 CJ est. value
Sioux City, IA 51104

29th Street Reconstruction (Jones Street to Cheyenne Boulevard)
Infrastructure
Post-Bid
$6,150,000 CJ est. value
Sioux City, IA 51104

Hma Resurfacing with Milling
Infrastructure
Results
IA

PCC Pavement - Grade and Replace
Infrastructure
Results
Sioux City, IA

SUX Aviation Center Project Rebid
New Construction, Infrastructure - 39,400 SF
Pending Verification
$13,644,584 CJ est. value
Sioux City, IA 51111

Moville Area Medical Clinic
New Construction, Infrastructure - 10,000 SF
Pending Verification
$5,900,000 CJ est. value
Moville, IA 51039

Wastewater Treatment Plant (WWTP) Capacity Expansion - 539-223 - City of Sioux City
Addition, Infrastructure
Conception
$1,310,000 CJ est. value
Sioux City, IA 51101

Plywood Trail - 459-321 - City Of Sioux City
Infrastructure
Design
$2,000,000 CJ est. value
Sioux City, IA 51101

Moville 2nd Street Overlay
Infrastructure
Post-Bid
$350,000 est. value
Moville, IA 51039

HMA Resurfacing with Milling
Infrastructure
Results
Sioux City, IA

Last Updated 05/31/2023 02:19 PM
Project Title

Big Sioux Crossing- 459-317 - City of Sioux City

Physical Address View project details and contacts
City, State (County) Sioux City, IA 51101   (Woodbury County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $934,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project would connect the Dakota Dunes trail system to the Sioux City Trail System with the construction and placement of a bike/pedestrian bridge located at Riverside Park. An effort to make this project a reality was undertaken in 2008. At that time, HR Green provided preliminary engineering on the project. Due to some resistance from South Dakota residents, the project did not move forward. As some time has passed and the importance of trails and quality of life initiatives continue to be in high demand, it seems appropriate to revisit the feasibility of this project. Subsequently, a public input meeting was conducted on September 15, 2021, regarding the construction of the proposed pedestrian bridge over the Big Sioux River. Nearly 100 people attended the meeting and provided their input regarding the locations that were presented. Tremendous support was expressed to more the project forward. Two major trail systems would be linked by building a bike/pedestrian bridge. The addition of the trail system would improve quality of life and economic growth for both states and cities. This project is included in the fy 2024-2028 Capital Improvement Program. As of May 31, 2023, further details regarding design completion and firm construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents