Similar Projects
On-Call Concrete Maintenance
Term Contract
Sub-Bidding
Arlington, VA 22203

Hydraulic Cement Concrete In Place
Alteration
Post-Bid
Bristol, VA

Wolf Creek Indian Village Concrete Work
Alteration
Post-Bid
Bastian, VA 24314

Concrete Hydro-Demolition
Term Contract
Results

Concrete Hydro-Demolition
Term Contract
Results

Retaining Wall Material - Skate Park
Infrastructure
Post-Bid
Charlottesville, VA 22903

Concrete Footings - Courthouse Park - Barton Outdoor Hockey Rink
Alteration
Results
Hanover, VA 23069

Stormcrete Precast Porous Concrete Slabs
Term Contract, Alteration
Post-Bid
VA

Pre-Cast Concrete Ew-1 Headwalls, Sydnorsville AHQ
Alteration
Results
Rocky Mount, VA 24151

Ready Mix Concrete
Term Contract, Alteration
Post-Bid
Floyd, VA

Pre-Cast Concrete Structures
Alteration
Results

Concrete Repairs at Fire Station 1
Alteration
Post-Bid
$2,000,000 est. value
Chester, VA 23831

Pre-Stressed Concrete Piles Rt 665
Alteration
Results

Ready Mix Concrete throughout Clarke, Warren and Frederick Counties
Alteration
Post-Bid
Berryville, VA

Concrete Installation and Repair Services - VCCS Wide
Term Contract
Results
Daleville, VA

Last Updated 11/10/2022 10:07 AM
Project Title

2022 Paving and Milling

Physical Address View project details and contacts
City, State (County) Wytheville, VA 24382   (Wythe County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $434,881 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Wytheville is seeking sealed proposals from qualified companies to perform paving and milling operations on Town of Wytheville public streets. The streets selected to receive new bituminous concrete paving and associated curb and tie in milling are as follows, a) The west bound lane of West Lee Highway beginning at the start of division into a divided 4 lane between North 22 nd & North 24 th Street and extending west to Laurel View Drive, including all crossovers between the east bound lane and west bound lane sections of West Lee Highway. b) North Petunia Road beginning at the intersection of West Lee Highway and Extending north 700 linear feet. c) North 4 th Street beginning at the west corporate limits and extending east 50 liner feet. d) Tremough Drive beginning at the west intersection of Tremough Drive and North 4 th Street and extending east to the east intersection of Tremough Drive and North 4 th Street, being at the section of Tremough Drive that travels parallel to North 4th Street. e) North 4 th Street both east and west bound lanes beginning at the I-81 South Exit 70 off ramp and extending west along North 4 th Street to the east entrance to Northwinds Apartment Complex located at 2355 North 4 th Street, including all crossovers between the east bound land and west bound lane sections of North 4 th Street. f) Peppers Ferry Road beginning at the east corporate limits and extending west 2000 linear feet (selected sections receiving complete milling and paving). g) South 6 th Street & West Union Street intersection, beginning at the center line of West Union Street at the intersection of the center line of South 6 th Street and extending west and east 35 linear feet along West Union Street, being the south half of West Union Street, and beginning at the center line of South 6 th Street at the intersection of the center line of West Union Street and extending south 100 linear feet along South 6th Street. When obtaining the requested documents, the Bidder shall designate a representative for all correspondence between the Town of Wytheville and the Bidder. This designation will also include the representative's name, title, address, phone number, fax number and email address. The design of this project was completed by the owner's in-house design professional. The Town of Wytheville prohibits discrimination on the basis of race, color, religion, faith- based organizations, gender identity, sexual orientation, political affiliation, age, disability, veteran status, national origin or any other basis prohibited by state law relating to discrimination in employment. SWAM and DBE firms are encouraged to apply. The Town of Wytheville is an Equal Opportunity Employer.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents