Similar Projects
Greenway Commons
New Construction - 20,000 SF
Conception
$70,000,000 est. value
Southington, CT

Collins Axe Factory Development Plan
New Construction, Renovation
Conception
Collinsville, CT

North Crossing
New Construction - 260,000 SF
Design
$200,000,000 est. value
Hartford, CT

Shuttle Meadow Country Club Condos
New Construction
Design
Berlin, CT

Westbrook Village Phase IV
New Construction
Sub-Bidding
Hartford, CT 06105

Pliny Street Housing
Renovation
Sub-Bidding
Hartford, CT 06120

Former Showcase Mixed-Use Development
New Construction
Post-Bid
East Hartford, CT 06108

Property Offered for Redevelopment at 488 Farmington Avenue
Renovation - 4,600 SF
Post-Bid
Hartford, CT

Rehabilitation at Mary Shepard Place Apartments, Bellevue Street and Sanford Street Apartments
Renovation
Results
$15,000,000 to $20,000,000 est. value
Hartford, CT 06120

Vacant Apartment Preparation - Make Ready for Occupany
Term Contract
Results
Hartford, CT 06105

Manchester Parkade Redevelopment
New Construction
Construction
$150,000,000 est. value
Manchester, CT 06040

HOH Boiler House
Renovation - 6,277 SF
Construction
$8,000,000 est. value
Hartford, CT 06100

Bond Residences
Renovation
Pending Verification
$1,000,000 est. value
Hartford, CT 06103

East Granby Meadows
Renovation
Pending Verification
East Granby, CT

Van Block Avenue Apartments
New Construction, Build-Out
Conception
Hartford, CT 06106

Reported 05/19/2022 12:00 AM
Project Title

Rehabilitation Work to the Tarka Residence

Physical Address View project details and contacts
City, State (County) Windsor, CT 06095   (Hartford County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $12,500 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. Remove existing roofing up to two layers, gutter & leaders on home/garage and dispose of properly. a) Replace degraded sheathing ($120.00 allowance per sheet allowance) b) Photograph any rot damage to sheathing and then any replaced sheets and send to Housing Rehab Specialist before roofing c) Provide and install first two courses with Ice and Water Membrane per GAF requirements (low sloped roofs between 2.12 and 4.12 pitch to be entirely covered with Ice and Water Membrane d) Install new lifetime architectural asphalt shingles manufactured by GAF on pitch greater than 2.12 and GAF Liberty SBS self-adhering cold applied asphalt roofing on low slope roofs less than 2.12 pitch e) Provide and install aluminum "drip" and "rake" edge flashing f) Replace all vents g) Color to be chosen by owner from manufacturers standard pipe and ventilation flashing systems, including but not limited to waste vents, bathroom, range and dryer ventilation h) Install new continuous ridge vent per GAF requirements i) Verify soffit ventilation, install vents as needed j) All work to be performed per building code requirements k) Refer to specifications for all work a) Replace existing chimney counter flashing with new copper flashing b) Remove Tar and Scarify existing brick masonry c) Install reglet joints and use masonry caulk at joint d) Solder all joints with lead solder e) All work to be performed per building code requirements f) Refer to specifications for all work g) Patch shingle with like material. h) All work to be performed per building code requirements i) Refer to specifications for all work 2) Gutters- Division 7 A. Remove and Install new aluminum ogee style seamless gutters and 2 x3 leaders a) Located on the "A-D" facades b) Utilize appropriate hangers c) Install new downspouts, accordingly, connect to existing drainage inverts or provide elbows and splash blocks d) Color to be chosen by owner 3) Smoke and Carbon Monoxide Detectors - Division 21 A. Provide and install new combination smoke detectors a. Located outside bedrooms (2) and at basement stairs. B. Provide and install smoke detectors, one in each bedroom (3) a) All detectors to be battery operated b) All work to be performed per building code requirements c) Refer to specifications for all work 4) Electrical - Division 26 A. Install GFCI protection at the following receptacles a) Located at kitchen counter "c" wall. b) Bathroom "c" wall. c) Verify integrity of box, wiring and ground d) Install new covers, matching existing color and style B. All work to be performed per building code requirements C. Refer to specifications for all work 5) WindowsA. Remove existing double hung windows. a) 2 total DH windows. b) Verify size c) Paint or stain new or disturbed work d) Install insulation in cavities and caulk all edges e) All windows to be manufactured by Mercury Excelum (with energy star glazing package) or an approved equal. f) All units to be white g) All operable units to include full standard fiberglass mesh screens h) Refer to specifications for additional information i) All work to be performed to code requirements

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents