Similar Projects
Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

Martinez II Facility Improvements
Infrastructure
Bidding
$125,000 est. value
San Antonio, TX

South Alamo Street (Market Street to Cesar Chavez Boulevard)
Infrastructure
Bidding
$15,400,000 est. value

Construction of Johnson Ranch North Unit 9 Public Water, Wastewater, Paving and Drainage Improvements and Johnson Ranch North Unit 9 Private Paving and Grading Improvements
Post-Bid
San Antonio, TX

Olmos Park FY 2020-2021 Street and Drainage Maintenance
Post-Bid
Olmos Park, TX

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

SECO Creek Headgate Project
Results
San Antonio, TX 78215

Redbird Ranch Phase 2 Unit 1M-3 and Unit 3M-3A
Post-Bid
TX 78253

Olmos Dam Drain Repair
Results
San Antonio, TX 78212

Repair Storm Drainage at The Medical Education Training Campus (METC).
Post-Bid
$500,000 to $1,000,000 est. value
San Antonio, TX 78275

Vance Jackson Low Water Crossings
Results
$6,356,000 est. value
San Antonio, TX 78205

2020 Streets and Drainage Improvement Project
Infrastructure
Post-Bid
$7,527,271 est. value
San Antonio, TX

Brooks City Base Stinson Corridor (Research Plaza to South Presa Street)
Results
$6,086,452 est. value
San Antonio, TX 78205

Preserve at Medina, Unit 3 and Watson Road Single-Family Residential Development Construction of Water, Sanitary Sewer, Streets, Drainage and Traffic Signal Improvements
Infrastructure
Post-Bid
San Antonio, TX 78073

Fire Station No. 2 Access and Drainage Improvements
Results
Schertz, TX

Last Updated 03/16/2022 08:51 AM
Project Title

CPS Bridge Riverbank Stabilization

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78204   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $172,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of installing and maintaining structural measures (turbidity curtain) and performing work to control erosion and minimize the production of sediment and other pollutants to downstream waters during construction operations. This item shall consist of all work necessary to control soil erosion and minimize the introduction of sediment and other pollutants to waterways. The Contractor is responsible for following the approved erosion and sedimentation control plan and permit requirements for the site and assumes liability for any fines or regulatory actions that may be imposed by the Contractor’s failure to do so. All erosion and sedimentation control measures shall be adequately maintained in a functional condition during construction and until the site is stabilized, as determined by the Engineer. All temporary erosion and sedimentation control measures shall be removed once the site is stabilized and accepted by the Engineer, and the site is restored to original conditions, or better, as determined by the Engineer.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents