Similar Projects
North Scrubber Complex Grating Replacement
Renovation
Bidding
$507,600 CJ est. value
Huntington Beach, CA 92646

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Annual Local Paving Program
Term Contract
Post-Bid
Seal Beach, CA

Central Library Fountain Restoration Project
Renovation, Infrastructure
Results
Huntington Beach, CA 92648

Cold Plane, Place RHMA and Modify Curb Ramps and Electrical Systems
Infrastructure
Results
$36,829,575 CJ est. value
Newport Beach, CA 92660

Concrete and Masonry Services
Alteration
Post-Bid
Placentia, CA

Service Monitor Replacement
Renovation
Results
$57,692 CJ est. value
Tustin, CA 92780

RFP Construction Manager at Risk - East Garden Grove Wintersburg Channel Bridges
Infrastructure
Post-Bid
$18,233,000 CJ est. value
Tustin, CA 92780

Street Improvement Project
Infrastructure
Results
$541,320 CJ est. value
Westminster, CA 92683

Athletic Field Improvements - Anaheim High School and Western High School, Katella High School Pool and Various Marquees
Infrastructure
Post-Bid
$18,000,000 CJ est. value
Anaheim, CA 92805

Zone 2 Residential Overlay
Infrastructure
Results
$15,205,188 CJ est. value
Huntington Beach, CA 92648

Portland Ready Mix Concrete
Term Contract
Post-Bid
Tustin, CA 92780

Citywide Park Improvements
Infrastructure
Results
$31,880 CJ est. value
Cypress, CA 90630

Bastanchury Road Improvements from Casa Loma Avenue to Eureka Avenue (Interconnect from valley view avenue to lakeview Avenue)
Infrastructure
Post-Bid
$7,000,000 CJ est. value
Yorba Linda, CA 92886

Orangethorpe Elementary and Commonwealth Elementary Grant Site Improvements
Infrastructure
Results
$1,005,298 CJ est. value
Fullerton, CA 92833

Last Updated 08/06/2023 02:03 AM
Project Title

Orange County Youth Transition Center (YTC)

Physical Address View project details and contacts
City, State (County) Orange, CA 92868   (Orange County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All RFP questions must be posted via the Countys online bidding system and are due by 07/10/2023 at 5:00 PM PT The proposed Project is for the Orange County Youth Transition Center (YTC) located at 331 The City Drive South, Orange, CA 92868. Construction is targeted for completion by May 2026. The current Project expected cost is approximately $100,000,000. Construction is targeted for completion by May 2026. a. Description of the proposed site layout and organization of YTC facilities, parking and site amenities that best meets the needs of Probation. Description of the proposed siting for new long-term housing unit for Juvenile Hall. Description of the proposed site layout and organization of Independent Living Units, parking and site amenities that best meets the needs of program providers, community organizations and Probation. b. Design information, including basis for design for major architectural elements, building structural systems, and major building engineered systems including, but not limited to, civil, plumbing mechanical, fire-protection, electrical power, lighting, audio-visual, IT, access control and security systems for YTC, Juvenile Hall and Independent Living Unit facilities. c. Description of plan for maintaining secure vehicle and pedestrian access to the campus during demolition of existing perimeter secure fencing, gates and equipment and installation of new secure fencing and access. d. General description of plan for protecting existing buildings and site features during demolition and new construction activities including access and continued operation of Control and the intended design and construction approach. e. General description of proposed perimeter secure fencing, site access control features, parking, site landscape areas, site hardscape areas, major associated infrastructure components, and the intended design and construction approach. f. Description of proposed connection to existing Juvenile Hall campus infrastructure systems including shutdown and tie-in plans. g. Operation and maintenance requirements, including start-up plan and staff training schedule. In addition, the project includes several facilities that will operate outside the YTC: o A 24-bed Long-Term Housing Unit to be operated as part of Juvenile Hall o A Classroom / Library Building for use by Juvenile Hall o Ten (10) Independent Living Units providing twenty (20) beds of supportive housing for males and females, and associated program space for youth transitioning out of Juvenile Hall, YLA and YTC. This facility will be located outside the secure perimeter. The total project is estimated at approximately 88,000 gross square feet of new building area and includes site access, new parking areas, outdoor recreation and landscape development and connections to existing Juvenile Hall systems and infrastructure. To create a clear area for construction of new facilities, the project includes demolition of several occupied and unoccupied buildings, perimeter security fencing, site amenities and landscaping. The campus has many mature trees that Orange County wishes to keep, and this should be taken into consideration during planning and design. All new facilities should be aesthetically pleasing with ample access to natural light and outdoor spaces. Integrated outdoor space should be available for programs, learning, recreational and leisure activities. New facilities and site development should be reminiscent of modern college and high school campus design with a cohesive material, color, and landscape palette used throughout. New buildings should look non-institutional and welcoming and provide youth and staff with spaces that feel natural, calm, and comforting. YTC should be designed with a sense of freedom and openness while still providing all the necessary features of a modern, secure juvenile facility. The use of institutional fencing and razor-wire is highly discouraged. The project should use the design and organization of new buildings, new landscape and new hardscape features to provide visual and physical separation between the YTC facility and Juvenile Hall. To the greatest extent possible, design of YTC should not rely on the use of permanent fencing, access control or gates to provide required facility separation.

Details

88,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents