Similar Projects
Sugnet and Main Sewer Improvement - City of Midland
Infrastructure
Conception
$723,808 est. value
Midland, MI 48640

Basin Repairs - Orchard Hill Place - ENG034 - City of Novi
Infrastructure
Conception
$492,940 est. value
Novi, MI 48375

Fire Station 2 Building Remodel
Renovation, Infrastructure
Bidding
$400,000 est. value
Jackson, MI 49203

Hot Mix Asphalt Reconstruction, Storm Sewer, Concrete Curb, Gutter, Sidewalk and Ramps Signing and Pavement Markings on Seminole Road
Infrastructure
Bidding
$1,233,000 est. value
Norton Shores, MI 49441

Catch Basin Cleaning
Post-Bid

Catch Basin Cleaning
Post-Bid

North Interceptor East-Arm PCI-4 Rehabilitation Contract No-1
Results
Waterford, MI 48328

Parking Lot Storm Line Replacement - 2020
Results
Brighton, MI 48116

Cornerstone Alliance - Industrial Park Stormwater Project
New Construction
Construction
Benton Harbor, MI 49022

Village Wood Road (Cranbrooke Drive to Haggerty Road) and Section 25 Storm Drainage Improvements - ENG081 - City of Novi
Infrastructure
Conception
$1,786,910 est. value
Novi, MI 48374

Monroe Consolidated Drain Improvements
Infrastructure
Bidding
$2,342,874 est. value
Monroe, MI

Storm/Sanitary Drain Piping Replacement
Post-Bid
$1,000,000 to $3,000,000 est. value
Detroit, MI

Big Beaver Relief Sewer
Results
Less than $4,000,000 est. value
Troy, MI

Basin Cleanout - Bishop Creek Regional (north of Grand River Avenue; west of Meadowbrook Road) - ENG050 - City of Novi
Infrastructure
Conception
$1,344,520 est. value
Novi, MI

Lake Bluffs Drain
Infrastructure
Bidding
$500,000 est. value
Suttons Bay, MI

Reported 06/21/2022 08:54 AM
Project Title

Streambank Stabilization - Middle Rouge River (along Rotary Park) - 093-10 - City of Novi

Physical Address View project details and contacts
City, State (County) Novi, MI   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $599,550 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Continuing the project to provide streambank stabilization through the Middle Rouge River. This project includes seven site areas along the Middle Rouge River that were identified to benefit from engineering intervention. The project will include excavation, tree removal, vegetative rip-rap and vegetative mechanically stabilized earth as methods to restore the streambank to a satisfactory condition. Portions of the streambank have fallen below standards of use. This project includes sites identified in the 2014 Storm Water Master Plan as Middle Rouge Sites #27 to #33. As of June 20, 2022, this project is currently in the FY 2022-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents