Similar Projects
South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Cypress Creek Rehydration and Natural Storage
Infrastructure
Bidding
$200,000 CJ est. value
Okeechobee, FL 34972

Cypress Creek Rehydration and Natural Storage
Infrastructure
Bidding
$200,000 CJ est. value
Okeechobee, FL 34972

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

SG Casino & Hotel - Brighton
New Construction, Infrastructure
Bidding
$60,000,000 CJ est. value
Okeechobee, FL 34974

RFP Engineering - SR-710/Beeline HWY fr N Congress Ave to Pres Obama HWY
Infrastructure
Post-Bid
$2,051,008 CJ est. value
Okeechobee, FL 34972

Silicone Joint Sealer
Infrastructure
Results

Emergency Lighting Permanent Repair and Replacement
Infrastructure
Post-Bid

Pine Ridge Park Utility Improvements
New Construction, Infrastructure
Results
$4,279,000 est. value
Okeechobee, FL

New South Florida Water Management District (SFWMD) Okeechobee Field Station
New Construction, Infrastructure - 100,000 SF
Post-Bid
$82,400,000 CJ est. value
Okeechobee, FL 34972

Last Updated 06/08/2023 02:38 PM
Project Title

Add Turn Lane(s)/Milling and Resurfacing/Traffic Signals/Base Work/Drainage Improvements

Physical Address View project details and contacts
City, State (County) Okeechobee, FL 34972   (Okeechobee County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,374,095 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Okeechobee Road Name: SR 70 Limits: From E of Us 441 to Ne 17th Ave Project(S): 4446411520(*) 44464115202 Federal Aid No: D122062B,D122062B Total Roadway Length: 0.937 Miles Contract Days: 250 Total Bridge Length: 0.035 Miles Total Proposal Length: 0.937 Miles Contract Execution Days: 10 Special Start Date: N/a Aquis/flexible Start Time: 120 Days (Aqui Time) The improvements under this contract consist of milling and resurfacing, base work, drainage improvements, curb and gutters, guardrail, traffic signals, signing and pavement markings, lighting, and other incidental construction along SR 70 from East of US 441 to NE 17th Avenue in Okeechobee County. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 003 Add Turn Lane(s)/Milling and Resurfacing/Traffic Signals/Base Work/Drainage Improvements

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents