Similar Projects
North River Development
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Fort Wayne, IN 46802

2023 North Side High School Stadium Restoration
Renovation
Post-Bid
$174,000 CJ est. value
Fort Wayne, IN 46805

Fishers Gateway Arena / Fishers
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
Fishers, IN 46038

Carmel High School Stadium South Support Building
Demolition, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Carmel, IN 46032

Phase II Skatepark Expansion
Addition, Demolition, Infrastructure
Post-Bid
$200,000 CJ est. value
New Castle, IN 47362

Eleven Park
New Construction, Infrastructure - 325,000 SF
Construction
$1,000,000,000 CJ est. value
Indianapolis, IN 46204

Gainbridge Fieldhouse - Video Production System Room Renovation
Renovation
Post-Bid
$550,000 CJ est. value
Indianapolis, IN 46204

BL601 – Memorial Stadium – Lighting Replacement (LED)
Renovation
Post-Bid
Bloomington, IN 47405

Spencer Elementary School Gym and Press Box Improvement Project
Renovation
Post-Bid
Spencer, IN 47460

Four Winds Baseball Field Expansion
New Construction
Pending Verification
South Bend, IN 46601

Ross-Ade Stadium East Condensate Line Replacement II
Renovation
Results
$617,000 CJ est. value
West Lafayette, IN 47906

Terre Haute Multi-Sports Complex and Waterpark - City of Terre Haute
New Construction, Infrastructure
Conception
$5,000,000 est. value
Terre Haute, IN

Terre Haute Multi-Sports Complex and Waterpark - City of Terre Haute
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Terre Haute, IN 47807

Four Winds Field Player Facility
Renovation, Infrastructure - 1,500 SF
Results
$2,000,000 CJ est. value
South Bend, IN 46601

Last Updated 06/01/2023 10:35 AM
Project Title

Replacement of the Infill Synthetic Turf At Lucas Oil Stadium

Physical Address View project details and contacts
City, State (County) Indianapolis, IN 46225   (Marion County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $4,900,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Those interested in submitting a Proposal shall proceed to the Northwest entrance of Lucas Oil Stadium at the date and time stated above. Attendance at the Pre-Proposal Meeting is mandatory for all Offerors and an Offeror's failure to attend will be grounds for its Proposal being deemed non-responsive. The RFP process, including the preparation, execution and submittal of Proposals, shall be conducted in accordance with the procedures and requirements of the RFP Documents and consistent with Indiana's Request for Proposal statutes for public purchasing - Indiana Code (I.C.) 4, all Proposals received shall be opened so as to avoid disclosure of contents to competing Offerors during the process of clarification, evaluation and solicitation of best and final offers, if any. After the Proposals are opened, the CIB may initiate and conduct discussions with one or more of the Offerors who submitted a Proposal, as further described in the RFP Documents. During the course of discussion between the CIB and Offerors whose Proposal are determined to be reasonably susceptible of being selected for award, the CIB may seek to obtain best and final offers. The CIB reserves the right to reject any and all Proposals. The CIB also reserves the right to waive any irregularities or informalities discovered in the Proposals or that may otherwise arise during the course of the RFP process. If the CIB awards a contract, it will be to the Offeror whose Proposal is determined to be the most advantageous to the CIB, taking into consideration price and other evaluation factors set forth in the RFP Documents. The successful Offeror will enter into a Contract directly with the CIB and will be required to provide a Performance Bond in the full amount

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents