Similar Projects
Doral Pedestrian Bridge Design Build
Bidding
$4,800,000 est. value
Doral, FL

Albee Road Bascule Bridge Repairs
Bidding
$3,484,377 est. value
Nokomis, FL 34275

Design Build-Step 1-Golden Gate Pkwy over Santa Barbara Canal Bridge Replacement
Post-Bid
Less than $5,200,000 est. value
FL

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

FL Mango Rd Over Pbc L-2 Canal Bridge Replacement
Results
Less than $900,000 est. value
Royal Palm Beach, FL 33411

23rd Street Pedestrian Bridge
Results
Less than $283,732 est. value
Sarasota, FL 34230

Design-Build SR 30 (US 98) Brooks Bridge No 570034 in Okaloosa County
New Construction, Infrastructure
Bidding
$125,567,551 est. value
FL

Repairs to Seven Bridges
Renovation
Post-Bid
Lighthouse Point, FL

Intermediate Bridges
Results
Less than $24,182,381 est. value
FL

Little Redfish Lake Bridge Replacement
Renovation
Bidding
FL

Boston Highway Bridge Repair
Renovation
Post-Bid
FL

Bridge Maintenance and Repair
Results
Saint Petersburg, FL 33731

Emergency Operations Repair and Rehabilitate Bridge Fender System- SR 30 (US 98)
New Construction
Bidding
$626,207 est. value
FL

Design-Build Services for the Underline - Phases 3 - 9
New Construction, Infrastructure
Post-Bid
$100,608,364 est. value
FL

Brookside Drive Bridge Replacement
Results
Less than $1,351,816 est. value
Sarasota, FL 34231

Last Updated 09/01/2021 02:13 AM
Project Title

Springhill Road Bridge Repair

Physical Address View project details and contacts
City, State (County) FL   (Leon County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work to be performed under this bid will be the installation of Helical Pile Support for the Springhill Road Bridge over Munson Slough. Helical Pile installation through the existing deck, as shown on the construction plans. This project is anticipated to take 30 calendar days to perform.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles, Special Foundations, Helical Foundation Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents