Similar Projects
Last Updated | 07/26/2023 09:56 AM |
Project Title | Bermuda Avenue Coastal Access Replacement |
Physical Address | View project details and contacts |
City, State (County) | San Diego, CA 92107 (San Diego County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dock/Pier/Marine, Maintenance, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,132,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The existing Bermuda Avenue beach access stairway provides access to the Bermuda Beach in South Ocean Beach at the western terminus of Bermuda Avenue. It has deteriorated after years of service in the erosive coastal environment. The stairway shows cracking, corrosion, and spalling. The project scope is to replace the existing access stairway that has failed at the middle flight and the supporting foundation block. The scope is to replace the existing with a new stairway and will generally follow the existing stairway. The new stairway consists of concrete block stairs founded in rock at the lowest flight with the top and the intermediate concrete landings supported on pile foundations. 1.1. The Work shall be performed in accordance with: 1.1.1. The Notice Inviting Bids and Plans numbered 41593-01-D through 41593-12-D, inclusive. The City has incorporated voluntary subcontractor participation percentage to enhance competition and maximize subcontracting opportunities as follows. The following voluntary subcontractor participation percentage for DBE, DVBE, WBE, MBE, SLBE, and ELBE certified Subcontractors shall apply to this contract: Total voluntary subcontractor participation percentage for this project is 10%. Pre-Bid Meeting No The Contract Time for completion of the Work shall be 195 Working Days. Online Q&A No Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 195 Working Days |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |