Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Construction Services for Poitras East Community Development District
Post-Bid
FL

Stormwater Drainage Expertise Lakewood Ranch Inter-District Authority Community Development District 5
Post-Bid
Lakewood Ranch, FL 34202

Storm Sewer Rehabilitation by Cured-In-Place Pipe (CIPP) Technology
Results
Less than $304,580 est. value
Jacksonville, FL

Y--IGF::OT::IGF RV Work Camp Sewer Connection
Results
Less than $25,000 est. value
Big Pine Key, FL

Stormwater Improvements
Construction
Lake City, FL 32055

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Plugged Storm Drains
Results
Everglades, FL

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

East College, East Jefferson & South Meridian Streets Water and Sewer Improvements
Results
Less than $2,739,200 est. value
Tallahassee, FL

South Campus Stormwater Management - DRA #4 Project
Post-Bid
Pembroke Pines, FL 33024

Stormwater Management System Prevent Maintenance
Term Contract
Results
Sunny Isles, FL 33160

Abandonment of Existing Septic System
Post-Bid
Orlando, FL 32805

Pre-Cast Storm Water Control Stuctures
Results
Kissimmee, FL 34741

Blue Lake Elementary - Stormwater Drainage Upgrade
Post-Bid
De Land, FL 32724

Last Updated 02/10/2021 11:09 AM
Project Title

Tower Oaks Two-Thirds Project

Physical Address View project details and contacts
City, State (County) FL   (Leon County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Leon County is seeking the services of a qualified vendor for the upgrading of the Tower Oaks Subdivision, located in Section 31, Township 2N, Range 1W, to Leon County Standards. Work shall include but not be limited to: removal and replacement of approximately 800 feet of existing stormwater piping, milling, resurfacing of the road ways, replacement of the stormwater pond sand filters, and miscellaneous sidewalk and driveway work, in accordance with Attachment A - Construction Plans, Attachment B - Geotechnical Report, Attachment C - Conflict Matrix, Attachment D - Summary of Pay Items and Attachment E - Leon County Supplemental Technical Specifications. The subdivision is currently private but will be accepted by the County for future maintenance once the improvements are completed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents