Similar Projects
Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Curb and Gutter Installations
Infrastructure
Post-Bid
Lake Villa, IL

Drainage Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Waukegan, IL 60085

Pulverization of The Existing Pavement and the Construction of Hot-Mix Asphalt Binder and Surface Courses
Results
Less than $137,064 est. value
Libertyville, IL

2021 Road Program
Infrastructure
Results
$1,350,000 est. value
Zion, IL

Peterson Road Mixed Use
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Libertyville, IL 60048

Parking Lot Replacement
Renovation
Post-Bid
Antioch, Grayslake, Gurnee, Round Lake Beach, Wauconda, Zion, IL 60030

Veterans Park Improvement
Alteration
Results
Lake Forest, IL

Elgin O'hare Western Access Tollway (I-490) Railroad Bridge Construction, Union Pacific Railroad Over Grand Avenue East of Tri-State Tollway (I-294)
New Construction, Infrastructure
Post-Bid
$20,812,779 CJ est. value
Gurnee, IL 60031

2021 ADA Improvements
Infrastructure
Results
Volo, IL

2022 Street Rehabilitation
Infrastructure
Post-Bid
Deerfield, IL

Sealcoating
Infrastructure
Results
Wauconda, IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

2021 Pavement Improvements
Infrastructure
Results
Wauconda, IL

Last Updated 06/01/2023 11:40 AM
Project Title

2023 Parking Lot Main- tenance project

Physical Address View project details and contacts
City, State (County) South Barrington, IL 60010   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $648,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

NOTICE TO CONTRACTOR VILLAGE OF SOUTH BARRINGTON 2023 PARKING LOTS The 2023 Parking Lot Main- tenance project consists of furnishing materials and services necessary to com- plete the repair, milling, patching, resurfacing, crack sealing and seal coat- ing maintenance activities of three (3) publicly-owned Village parking lots within the Village of South Barring- ton, Illinois. Furthermore, this project generally con- sists of Hot-Mix Asphalt Surface Removal, Class D Patches, Hot Mix Asphalt Surface and Binder Course Pavement, Crack Sealing and Seal Coating of three (3) existing Municipal Parking Lots. The completion date of the project is August 25, 2023. The project also includes an option for an additional an- nual contract extension for future work. As part of the annual Contract extension both par- ties mutually agree and ac- cept the conditions as stated within the original Contract, with an increase in the unit prices as allowed under the C Documents are available in person only.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents