Project Title | East Street LRIP Mill and Overlay Repaving |
Physical Address | View project details and contacts |
City, State (County) | New Auburn, WI 54757 (Chippewa County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $55,749 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Asphalt Pulverizing, DOT Projects, Paving (Highway, Road or Street) Work on this contract consists of the reconstruction East Street from Pine St to Park St. This is a rural section. Work includes but not limited to: Hot mix asphalt, pulverizing and aggregate shoulders. Construction must be completed by October 1st, 2023. Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form. The Village of New Auburn reserves the right to reject all bids, without cause, and accept the bid that is in the best interest of the Village of New Auburn. Bids shall be on the forms provided for that purpose and per the Contract Documents prepared by CBS Squared Inc. identified as "East Street LRIP Mill and Overlay Repaving" No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. Bidder is required to deliver the original certified check or bid bond within 72 hours of the bid opening to CBS Squared, Inc., ATTN: Kristi Lentz, 770 Technology Way, Suite 1A, Chippewa Falls, WI 54729. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. Published by the authority of the Village of New Auburn. Bidders must submit a Bidders Proof of Responsibility in accordance with the Instructions to Bidders. Bidders will be required to provide performance and payment bonds of 100 percent of bid amount. The Village of New Auburn reserves the right to reject all bids, without cause, and accept the bid that is in the best interest of the Village of New Auburn. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |