Similar Projects
Lake Griffin Preserve
New Construction
Conception
Leesburg, FL 34748

The Sanctuary Master Plan
New Construction
Conception
Clermont, FL 34714

Swiss Fairways Golf Club Residences
New Construction
Design
Clermont, FL 34711

Timberwalk
New Construction
Design
Mount Dora, FL 32757

General Contractors for Housing Rehabilitation
Results
Groveland, FL 34736

Private Development of Lakefront Property
Results
Clermont, FL 34711

Hartwood Landing
New Construction
Construction
Clermont, FL 34711

Lakeside at Waterman Village
New Construction - 390,200 SF
Construction
$82,500,000 est. value
Mount Dora, FL 32757

Phillips Landing
New Construction
Conception
Groveland, FL 34711

Mirror Lake Subdivision
New Construction - 115,500 SF
Design
Clermont, FL 34711

Parkview at the Hills
New Construction
Construction
Minneola, FL 34715

Woodbury
New Construction - 136,500 SF
Design
Mascotte, FL

Windy Ridge
New Construction
Construction
Grand Island, FL 32735

Avex Homes
New Construction
Design
Mascotte, FL

The Cottages on 11th
New Construction
Construction
Mount Dora, FL 32757

Last Updated 02/17/2020 03:44 PM
Project Title

Residential Rehabilitation for Ship and CDBG Programs

Physical Address View project details and contacts
City, State (County) Tavares, FL 32778   (Lake County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $167,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition and Replacement effort at a single property. The general requirement is to replace roofs in kind in full accordance with all code requirements. Each request for job-specific pricing will provide detail regarding the specific work to be performed. Examples of residential roofing effort(s) to be performed under the program include, but are not limited to: - Removal and replacement of roof sheathing; - Removal and replacement of roof shingles minimum 30-year architectural; - Permit fees (vendor acquires and pays for all required permits); - Dumpster and debris removal from site.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents