Similar Projects
Last Updated | 08/02/2021 11:38 PM |
Project Title | FY21 Annual Resurfacing Phase 1 CR 389 Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Panama City, FL (Bay County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,434,612 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Consist of earthwork operations, base repair in selected areas, milling, paving, the addition of a left turn lane onto Dundee Road, striping, stabilization of all disturbed areas, and lining of existing cross drains.to provide all necessary labor, supervision, equipment, and supplies to resurface CR 389 from SR 390 extending south approximately 2.16 miles to Baldwin Road. The project will consist of earthwork operations, base repair in selected areas, milling, paving, the addition of a left turn lane onto Dundee Road, striping, stabilization of all disturbed areas, and lining of existing cross drains. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |