Similar Projects
Add/Repair Base Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Shaw Air Force Base, SC 29152

Manning Road Fire Station Driveway Replacement
Bidding
Sumter, SC 29150

State Street Resurfacing FY 19/20
Post-Bid
Sumter, SC 29151

Grier Street Road Improvements
Post-Bid
Sumter, SC 29150

Interstate 26 Widening MM 85-101
Results

Paving of Industrial Road/High Street - CTC 2019
Results
Sumter, SC 29150

Paving of Homestead Road and Rogdwin Road
Post-Bid
Sumter, SC 29153

Oak Hill Road Paving
Results
Less than $693,311 est. value
Lexington, SC

Asphalt Repair and Concrete Addition
Post-Bid
$13,000 est. value
Sumter, SC 29153

Pine Plain Road Paving
Results
Less than $1,124,780 est. value
Lexington, SC

Roadway Improvements to Ruth Vista Road
Post-Bid
SC 29073

US 1 Widening Project From S-31 to SC 23
Results
SC

Reconstruction/Rehabilitation - Sumter/Lee Co
Post-Bid

I-26 Safety Improvements
Results
SC

Raised Pavement Markers - District 1
Post-Bid

Last Updated 12/11/2019 05:54 AM
Project Title

Preservation - District 1

Physical Address View project details and contacts
City, State (County) (Lee, Lexington, Sumter Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 150.000 Sy Unclassified Excavation 80.000 Cy Maintenance Stone 172.000 Ton Liquid Asphalt Binder Pg64-22 8.480 Ton Full Depth Asph. Pav. Patching 6" Unif. 50.000 Sy Full Depth Asph. Pav. Patching 8" Unif 950.000 Sy Milling Existing Asphalt Pavement 2.0" 1,600.000 Sy Clean And Seal Cracks In Asphalt Pavement 4.600 Lami Hot Mix Asphalt Surface Course Type b 160.000 Ton Micro Surfacing Surface Course 241,850.000 Sy Permanent Construction Signs (Ground Mounted) 1,440.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 19,560.000 Lf 6" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 1,800.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 230,350.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 65,100.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 6,450.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 2,532.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 20.000 Ea White Single Bike Lane Arrow (Lt, Straight, Rt)-Fast Dry Paint 10.000 Ea White Word Message "Only"-Fast Dry Paint 20.000 Ea Bike Lane Symbol - Fast Dry Paint 10.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 22,320.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 354,015.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 950.000 Lf 4" White Broken Lines -(Gaps Excluded) - Epoxy Paint 280.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Epoxy Paint 1,120.000 Lf 4"Yellow Solid Lines-Pvt.Edge&No Passing Zone - Epoxy Paint 2,235.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 6,070.000 Lf 6" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 600.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 62,800.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 21,700.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 2,150.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Thermo-125mil 15.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 795.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 10.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 10.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 6,100.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 58,650.000 Lf 24" Yellow Solid Lines - Thermoplastic - 125 Mil. 475.000 Lf Bike Lane Symbol -Preformed Thermo - 60mil 5.000 Ea Bike Lane Arrow - Preformed Thermo - 60mil 5.000 Ea Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 400.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 110.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,170.000 Ea Removal Of All Pavement Markings 34.590 Lm 4" White Broken Lines- (Gaps Excld) - Single Component Hybridized Polymer– 20 Mils 450.000 Lf 4" White Solid Lines-(Pavement Edge Lines)-Single Component Hybridized Polymer–20 Mils 66,432.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Sc Hybridized Polymer- 20mil 001 15.000 Lf 24" White Solid Lines-(Stop/Diagonal Lines)-Single Component Hybridized Polymer–20 Mils 339.000 Lf 4" Yellow Broken Lines (Gaps Excluded) - Single Component Hybridized Polymer - 20 Mils 1,340.000 Lf 4" Yellow Solid Lines (Pavement Edge & No Passing Zone) - Single Component Hybridized Polymer - 20 Mils 59,355.000 Lf Detectable Warning Material 75.000 Sf Pedestrian Ramp Construction 150.000 Sy

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents