Similar Projects
Park Vista at El Tesoro Lift Station Facilities
New Construction
Bidding
Houston, TX 77083

Grease Trap and Lift Station Services
Infrastructure
Bidding
Pasadena, TX

Point Aquarius Subdivision Section 1 Waterline Replacement Phase IV
Post-Bid
Houston, TX 77378

Backflow Preventers Certifications, Testing and Repair Services
Term Contract
Post-Bid
Houston, TX 77055

Wastewater Meters for Force Mains Into Sagemont WWTP
Results
TX

Drinking Water Sampling Station Installation
Results
$1,991,240 est. value
Houston, TX 77251

Marvida Lift Station
New Construction
Bidding
$1,170,000 est. value
TX

Kingwood High School - Backflow Preventer
Post-Bid
$100,000 est. value
Kingwood, TX 77339

HPW - 66-Inch Water Line Interconnection Along W. Hardy Road from Beltway 8 to Greens Road
Results
$20,419,245 est. value
TX

Construction of Water, Sanitary, Drainage, and Paving Facilities in Marvida Section 19
Infrastructure
Bidding
$1,900,000 est. value
TX

Grey Water Project
Post-Bid
Jersey Village, TX 77040

South Campus Domestic Water Line Upgrades and Replacement
Results
$950,000 est. value
Houston, TX 77089

Construction of Water, Sanitary and Drainage Facilities in Marvida Section 13
Infrastructure
Bidding
$1,344,600 est. value
TX

Interconnect Meter Station No. 2
Post-Bid
Houston, TX 77080

East Houston Water Plant and Waterline Rehabilitation
Results
Highlands, TX 77562

Reported 08/13/2021 12:00 AM
Project Title

Lift Station No. 8 Force Main Replacement

Physical Address View project details and contacts
City, State (County) The Woodlands, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $279,815
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: installing approximately 600 linear feet of a new 6” diameter force main. The new line will run from Lift Station No. 8 crossing underneath Sawmill Road, then parallel along Sawmill Road within the road right-of way to the termination manhole. The project will also include, but not necessarily limited to, cutting and plugging of existing force main, all required connections associated with new force main line, coating of the termination manhole, and site restoration.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents