Similar Projects
Aggie Square at UC Davis - Phase 2
New Construction
Conception
Sacramento, CA 95817

UC Berkeley Upper Hearst & Goldman School of Public Policy
New Construction
Conception
Berkeley, CA 94720

Evergreen Valley College Student Services Complex
New Construction - 71,000 SF
Design
$54,700,000 est. value
San Jose, CA 95135

San Jose City College Career Education Complex
New Construction, Renovation - 125,000 SF
Design
$112,000,000 est. value
San Jose, CA 95128

Task Order Construction Agreement for Multiple Projects
New Construction
Bidding
Sacramento, CA 95819

CSU San Marcos - General Construction
New Construction
Bidding
Less than $752,000 est. value
San Marcos, CA

Expansion of Existing Food Bank Warehouse 3
Addition
Sub-Bidding
Bakersfield, CA 93307

FANUC Robot Tabletop Systems
Renovation, Alteration
Post-Bid
Bakersfield, CA 93314

Porterville College Jamison Stadium Field Upgrades Project
Renovation, Infrastructure
Results
$3,500,000 est. value
Porterville, CA 93257

Extra Space Storage
New Construction - 26,721 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
La Quinta, CA 92253

Amazon Delivery Station
Renovation - 202,421 SF
Construction
Moorpark, CA 93021

UCLA Rosenfeld Hall
Renovation
Pending Verification
$20,000,000 est. value
Los Angeles, CA 90095

Pratt & Whitney Research Facility
Renovation - 33,263 SF
Pending Verification
$1,500,000 est. value
Carlsbad, CA 92008

Helen Baszucki Center for Nursing Excellence School
New Construction
Conception
Less than $3,000,000 est. value
Monterey, CA

City College of San Francisco STEAM Building
New Construction - 160,000 SF
Design
$160,000,000 est. value
San Francisco, CA 94112

Last Updated 09/16/2021 11:15 AM
Project Title

Design-Build Project-Tech Park Phase 2

Physical Address View project details and contacts
City, State (County) San Luis Obispo, CA 93405   (San Luis Obispo County)
Category(s) Commercial, Education
Sub-Category(s) College/University, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The design and construction, under a procedure more commonly referred to as "turnkey construction", of a multi-story pre-engineered metal building and associated sitework, for the Technology Park.

Details

College/University, 20,000 to 30,000 SF New Construction, Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Parking Control Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents