Similar Projects
Corrections Building B HVAC System Replacement
Alteration
Bidding
$1,600,000 est. value
Orlando, FL 32839

HVAC and Mechanical Products
Term Contract
Post-Bid

York Chiller Maintenance Services
Post-Bid
Orlando, FL

Orange County Corrections Phoenix Chiller Replacement
Results
Less than $645,000 est. value
Orlando, FL 32839

City-Wide Air Conditioning and Heating Maintenance
Term Contract
Results
Ocoee, FL 34761

Daikin/Mcquay Chillers Maintenance
Post-Bid
Orlando, FL 32827

HVAC Maintenance and Repair for Utilities Facilities
Term Contract
Results
FL

Corrections Booking and Release Center Air Handling Unit (AHU) Replacement
Post-Bid
$1,350,000 est. value
Orlando, FL 32839

Rooftop Unit (RTU) Replacement
Results

HVAC Services at The Catholic Charities of Central Florida
Term Contract
Post-Bid
Orlando, FL 32813

Orange County Hall Marston Center Chiller Replacement
Results
$420,000 est. value
Orlando, FL 32808

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Installation and Repair Services
Term Contract
Results
Orlando, FL

Wolf Lake Middle School HVAC and Controls Upgrades
Alteration
Post-Bid
Apopka, FL 32712

AC Replacements for Toll Plazas on SR 408, SR 414 and SR 429
Results
$1,585,055 est. value
Orlando, FL

Reported 07/12/2022 12:00 AM
Project Title

Construction Manager - Lockhart Middle School Mechanical (HVAC) Capital Renewal Project

Physical Address View project details and contacts
City, State (County) Orlando, FL 32833   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected February 2023
Bids Due View project details and contacts
Estimated Value $5,300,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Major elements of the project include: 1. A HVAC Capital Renewal project for: Lockhart MS located at 650 E. River Falcons Way, Orlando, FL 32833. 2. Renovation of the campus heating, ventilating and air conditioning (HVAC) system, including renovation of the building air distribution system; a new building automation system; conversion of building 400 to a chilled water system connected to the central energy plant (CEP); replacement of mechanical equipment (including but not limited to chillers, pumps and VFDs) and piping at the central energy plant (CEP) and reconfiguring piping to a variable primary system; and a new pump house shelter. Replacement of a campus lift station is also included.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment, Humidity Control Equipment, Mechanical Dehumidification Units.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents