Similar Projects
New School Facility & PreK-12 Complex
New Construction
Conception
Baton Rouge, LA

Phase 5- Auditorium Entry Lobby and Parking Additions Washington Marion High School
Addition
Bidding
Lake Charles, LA 70615

Renovations to North Webster Junior High Football Stadium
Renovation
Bidding
$750,000 est. value
Sarepta, LA 71071

University View Academy
Renovation - 10,800 SF
Post-Bid
$1,500,000 est. value
Baton Rouge, LA 70808

St. Bernard Christian Academy
New Construction - 40,239 SF
Post-Bid
Meraux, LA 70075

Sulphur 9th Grade School
Renovation
Results
Calcasieu, Sulphur, LA 70663

Sulphur 9th Grade School
Renovation
Results
Calcasieu, Sulphur, LA 70663

The Career Center
Renovation - 132,881 SF
Construction
$10,000,000 CJ est. value
New Orleans, LA 70116

Holy Family Catholic School
New Construction - 22,500 SF
Construction
Lafayette, LA 70501

Great Hearts Charter School - South
New Construction - 35,376 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Baton Rouge, LA 70810

Great Hearts Charter School - North
New Construction - 70,607 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Baton Rouge, LA 70810

Site Preparation, Elevated Walkways, Canopies and Utility Rough-In and Connection to Modular Buildings for Temporary Campus Ellender Memorial High School
Renovation
Bidding
Houma, LA 70363

Hurricane Laura Damages Restoration to CPSB Administration Building
Renovation
Post-Bid
Lake Charles, LA 70615

Hurricane Repairs for Calcasieu Parish School Board
Renovation
Results
Lake Charles, LA

Site Preparation, Elevated Walkways, Canopies and Utility Rough-In and Connection to Modular Buildings for Temporary Campus South Terrebonne High School
Renovation
Bidding
Bourg, LA 70343

Last Updated 01/17/2022 07:06 AM
Project Title

St. Tammany Junior High School Elevator Addition

Physical Address View project details and contacts
City, State (County) Slidell, LA 70458   (Saint Tammany County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the Project includes construction of a new elevator, pit, shaft, enclosure finish with equipment room at existing school building, and miscellaneous paving modifications for accessibility compliance, including but not limited to: 1. Site grading and drainage (ALTERNATE ONE) 2. Site paving (ALTERNATE ONE) 3. Utilities 4. Elevator pit, concrete and slab 5. Waterproofing of pit and foundation 6. Steel sheave beam and steel lintels 7. Various finishes and specialties 8. SBS modified bitumen roofing on metal deck 9. Standing seam roof to match existing. 10. Brick veneer and Portland cement plaster at exterior walls 11. Patching and finishing to match existing interiors. 12. Hydraulic Elevator 13. Doors, frame, and hardware; new and alterations to existing. 14. Plumbing and piping 15. Electrical 16. Voice/ data communication system 17. Tie-in to existing fire alarm system 18. HVAC split unit

Details

Middle/Senior High School, Addition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 14 - Conveying Equipment, Elevator Equipment and Controls.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents