Similar Projects
Le Bon Vivant
New Construction - 21,877 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Wauwatosa, WI 53213

Mixed Use Building
New Construction - 193,000 SF
Conception
$10,000,000 CJ est. value
Wauwatosa, WI 53226

Edison Apartments
New Construction
Design
$20,000,000 est. value
Milwaukee, WI 53209

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

Avenir Apartment Homes Phases II & III
New Construction - 96,557 SF
Post-Bid
$26,000,000 est. value
Milwaukee, WI 53202

Equity Investors - Westlawn Renaissance Vii
New Construction
Post-Bid
Milwaukee, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Crack Filling
Infrastructure
Results
Wauwatosa, WI

Phillis Wheatley Redevelopment
Renovation - 140,880 SF
Construction
$22,000,000 est. value
Milwaukee, WI 53206

The Watertown Multi Family Housing
New Construction - 145,000 SF
Construction
$14,300,000 est. value
Wauwatosa, WI 53226

BV+ Apartments
New Construction - 26,296 SF
Pending Verification
$800,000 est. value
Milwaukee, WI 53207

SoHi Lofts
Renovation - 2,000 SF
Pending Verification
$90,000 est. value
Milwaukee, WI 53233

Harlow & Hem Development
New Construction
Conception
Wauwatosa, WI 53213

Nova Apartments
New Construction - 2,400 SF
Design
$35,000,000 est. value
Milwaukee, WI 53202

Equity Investors - Carver Park
Renovation
Post-Bid
Milwaukee, WI

Last Updated 02/28/2023 04:24 PM
Project Title

Drew Tower

Physical Address View project details and contacts
City, State (County) Wauwatosa, WI 53226   (Milwaukee County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Office, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Abandoned, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 28-story mixed-use development to include six levels of garage parking, 80,000 square feet of office space and 65 residential units. As of February 28, 2023, the developer is scrapping this project to build a car wash instead. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

28 Stories Above Grade, New Construction, New Construction. Parking Spaces, 572 Parking Spaces. 80,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents