Similar Projects
Last Updated | 05/04/2021 11:13 AM |
Project Title | SWSP - Contract S3- A3 - 42-Inch Water Line along Center Point Energy Corridor from Lakeside Forest Lane to I-10 Frontage Road |
Physical Address | View project details and contacts |
City, State (County) | Houston, TX 77282 (Harris County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $12,175,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Contract is for construction of approximately 8,900 linear feet of 42-inch diameter water lines with all necessary valves and appurtenances, from north of Lakeside Forest Lane to north side of Interstate Highway 10. The proposed water line installation will consist of primarily open cut construction; however, tunnels are required at some crossings of Harris County roads, TxDOT roads, Harris County Flood Control District (HCFCD) drainage systems, and private pipelines. Additionally, this work necessitates the partial removal and replacement of backslope swales owned and maintained by the Center Point Energy. Details of this work are provided in the Construction Drawings and Project Manual. This project is a part of the overall Surface Water Supply Project. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |