Similar Projects
Asphalt Repair at the Southwest Water Treatment Plant
Post-Bid
Madison, AL 35758

Asphalt Repairs for the Water Department
Term Contract
Post-Bid
Huntsville, AL 35811

Southern Region Disaster Recovery Support BPA
Results

Short Street Widening Project
Term Contract
Results
Madison, AL 35758

Jordan Road and Homer Nance Road Roundabout
Post-Bid
Huntsville, AL 35811

Rebuild FY20 - Road Resurfacing and Striping
Results
Less than $3,903,859 est. value
AL

Resurfacing of Residential Streets-2020, Phase I
Results
Huntsville, AL 35801

Greenbrier Parkway, Phase IV-B
Results
Huntsville, AL 35801

Cecil Fain Drive Roadway Improvements
Renovation, Addition
Results
Huntsville, AL 35801

Asphalt Repairs for Water Department
Term Contract
Results
Less than $450,000 est. value
Huntsville, AL 35801

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Constructing the Resurfacing and Traffic Stripe
Results
$422,473 to $516,356 est. value
Madison, AL 35757

Constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Strip
Results
$12,689,824 to $15,509,785 est. value

Constructing the Operational Improvements (Micro-Milling, Resurfacing, and Traffic Stripe)
Results
$1,705,628 to $2,084,656 est. value
AL

Balch-Gillespie Roundabout Project
Results
Madison, AL

Reported 05/14/2021 12:00 AM
Project Title

2021 Pavement Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35810   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Mill and Overlay of Glenn Hearn Blvd as well as a crack seal and rejuvenation of the loop road of Glenn Hearn Blvd and the cleaning and restriping of the concrete pavement of Glenn Hearn Blvd. The project shall also consist of a Crack Seal and Seal Coat of Taxiways C, C2, C3, and E5.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents