Similar Projects
Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Pedestrian Tunnel Replacement (underneath South Lakeshore Drive) - Lakeshore Park - ENG084 - City of Novi
Alteration
Conception
$507,530 est. value
Novi, MI 48377

Concrete Shared-use Path, Curb, Gutter, Sidewalk and Ramps, Storm Drain and Pavement Markings on Woodward Avenue
Infrastructure
Design
$2,739,086 CJ est. value
Pleasant Ridge, MI 48069

The Backyard of Kalamazoo
New Construction, Infrastructure - 4,990 SF
Design
$2,000,000 CJ est. value
Oshtemo Township, MI 49009

Hudson - Baldwin, IH 94 SWEF 61 Hudson
Infrastructure
Bidding
$25,000,000 CJ est. value
Baldwin, WI 54002

Moorland Neighborhood - ReBid
Infrastructure
Bidding
$6,165,325 CJ est. value
Midland, MI 48640

East Tank Cleaning
Term Contract
Sub-Bidding
Flint, MI 48532

Lake Erie Cove Point Vault Latrines
Demolition, Infrastructure
Sub-Bidding
$84,000 CJ est. value
Brownstown, MI 48173

Site Improvements
Post-Bid
Battle Creek, MI 49037

Webster School Site Improvements
Post-Bid
Escanaba, MI 49829

Excavation and Dirt Moving Services
Term Contract
Results
Mason, MI 48854

Conant Street, Detroit-Site Remediation
Results
Hamtramck, MI 48212

PNC Bank Branch No. B605
Renovation
Construction
Kentwood, MI 49508

General Contracting Services
Renovation - 11,600 SF
Construction
$7,700,000 est. value
Grand Rapids, MI 49512

2022 Bond - Montague Area Public Schools
New Construction, Infrastructure
Pending Verification
$12,700,000 CJ est. value
Montague, MI 49437

Last Updated 07/28/2022 12:37 PM
Project Title

Summit Street Water Storage Tank Painting - WS.28 - City of Brighton

Physical Address View project details and contacts
City, State (County) Brighton, MI 48116   (Livingston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $775,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project would include prepping and applying a new protective coating to the 700,000 gallon water storage tank to protect the steel structure from premature failures and improve appearance. The project is included in the City of Brighton's 2023-2028 Capital Improvement Program (CIP). As of July 28, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents