Similar Projects
Polo Gardens
New Construction - 32,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Lake Worth, FL 33467

Legend Lakes
New Construction
Conception
Royal Palm Beach, FL 33411

Windsor Place
New Construction - 5,100 SF
Design
West Palm Beach, FL 33417

Okeechobee Boulevard Residential
New Construction - 76,230 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Palm Beach, FL 33417

Lee Square
New Construction - 1,217,016 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Lake Worth, FL 33463

The Nature Conservancy Bunk House
Renovation - 1,830 SF
Post-Bid
Jupiter, FL 33469

Development and Disposition of CRA-Owned Properties-SW Neighborhood for Workforce Housing (Carver Square)
Results
Delray Beach, FL 33344

Development and Disposition of CRA-Owned Properties-SW Neighborhood for Workforce Housing (Carver Square)
Results
Delray Beach, FL 33344

Boca Flores
New Construction - 55,512 SF
Construction
$33,864,875 est. value
Boca Raton, FL 33428

Pointe Midtown Townhomes
New Construction - 28,262 SF
Construction
$5,000,000 est. value
Palm Beach Gardens, FL 33418

Ranchette Square
New Construction
Pending Verification
Greenacres, FL 33415

Crystal Cove
New Construction
Conception
Tequesta, FL 33469

Brentwood Village
New Construction
Design
$95,650,000 est. value
Boca Raton, FL 33433

Notice of Intent to Dispose
New Construction
Post-Bid
Boynton Beach, FL 33435

Former Gove Elementary School Property Development
Results
Belle Glade, FL

Last Updated 06/15/2022 07:08 AM
Project Title

Northwood Hills Neighborhood Improvements

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33407   (Palm Beach County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes, Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,532,211
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish and assume full responsibility for all labor (including costs for overtime, nights, weekends, holiday and multiple phasing work), materials, construction equipment and machinery, transportation, tools, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other facilities, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit and other incidentals necessary to perform the Work, as shown on the construction plans titled "Northwood Hills Neighborhood. Improvements" dated December 2021 and associated technical specifications.

Details

Multi-Family Homes, New Construction, Single-Family Homes, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents