Similar Projects
Powder Springs Resurfacing Project
Bidding
Powder Springs, GA 30127

Resurfacing Contract 2021-3, Local Roads (North)
Bidding
GA

NPHS Track Resurfacing
Post-Bid
Dallas, Douglasville, Hiram, Powder Springs, Rockmart, Temple, Villa Rica, GA 30132

Asphalt Paving, Patching and Resurfacing
Post-Bid
Dallas, Douglasville, Hiram, Powder Springs, GA 30157

Southern Region Disaster Recovery Support BPA
Results

2019 LMIG Street Resurfacing Project
Results
Atlanta, GA 30303

Sandtown Road Safety and Operation Improvements
Bidding
Marietta, GA 30067

T32 - Routine Maintenance Services - District 7
Term Contract
Post-Bid

City Wide Resurfacing Project
Results
Less than $1,399,805 est. value
Smyrna, GA 30080

2021 Resurfacing Program
Bidding
Marietta, GA

2021 Countywide Unit Price Contract
Term Contract
Post-Bid
Marietta, GA

Pavement Preservation Maintenance at Newnan, Powder Springs and Hamilton Mill Xpress Park and Ride Lots
Results
Hamilton, Newnan, Powder Springs, GA

Spout Springs ES Access Drive Modifications
Bidding
Flowery Branch, GA 30542

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

LMIG Resurfacing - General Paving Services
Results
Powder Springs, GA

Last Updated 03/22/2021 03:47 AM
Project Title

Kennesaw Mountain Pedestrian Improvements

Physical Address View project details and contacts
City, State (County) Marietta, GA   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of an 8 foot to 10 foot wide shared use path consisting of three segments: east along Cheatham Hill Road from Powder Springs Road (SR360) to John Ward Road (2.06 miles), south along Whitlock Avenue (SR120) from John Ward Road to Cheatham Hill Drive (0.53 miles), and west along Burnt Hickory Road from Whitlock Avenue (SR120) to Polk Street then switching to the east side of Burnt Hickory Road to the National Park Service (NPS) parking lot near Old Mountain Road (1.26 miles).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents