Similar Projects
Dreamy Hollow/Betts Brook Area Drainage, Sanitary Sewer and Water Main
Infrastructure
Bidding
Norwalk, CT

Allen Street Drainage Improvements
Infrastructure
Bidding
$50,000 est. value
Stonington, CT

Replacement of Culvert Carrying Bethke Road over Powder Meadow Brook
Post-Bid
Killingworth, CT

Ward-Heitmann House Museum Drainage Improvements
Renovation
Post-Bid
New Haven, Shelton, West Haven, CT 06516

Replacement of Camp Dutton Road Culvert over Unnamed Brook
Results
$200,000 est. value
Litchfield, CT

East Hartford Connecticut Flood Control System Toe Drain Repair Project Phase 1
Results
Less than $1,729,783 est. value
East Hartford, CT

Pratt Street Culvert Rehabilitation
Post-Bid
Winsted, CT 06098

Drainage and Catch Basin Installation
Results
Morris, CT

Jesup Green Seawall Repairs Project
Post-Bid
Westport, CT

Cascade Road Drainage Improvements
Results
$250,000 est. value
Stamford, CT 06903

Removal of Derelict Pipe from Tidal Creek
Post-Bid
Madison, CT 06443

Excavation and Drainage Installation 2020
Term Contract
Results
Middlebury, CT

Highway Department Yard Culvert
Post-Bid
Trumbull, CT

Kensington Avenue Culvert
Results
Meriden, CT

Trench Restoration 2021
Post-Bid
Southington, CT

Last Updated 11/11/2021 09:06 AM
Project Title

Culvert Replacement Lydall Brook at Ambassador Drive

Physical Address View project details and contacts
City, State (County) Manchester, CT 06042   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this contract includes the furnishing and installation of 90 linear feet of twin 6`x3` precast concrete box culverts on Ambassador Drive at Lydall Brook. It includes other appurtenant work such as removal of existing twin ACCMP culverts, road reconstruction, precast concrete curb, concrete sidewalk, channel and turf restoration and handling water. This project is an emergency project to restore damage caused by Tropical Storm Henri. Work is expected to commence immediately upon contract award with no winter shutdown in order to open the roadway to the public as soon as possible.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents