Similar Projects
Last Updated | 10/06/2021 04:11 PM |
Project Title | Midway - Farm to Market Phase 3 & Solano County Roadway Preservation |
Physical Address | View project details and contacts |
City, State (County) | Fairfield, CA 94534 (Solano County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $3,900,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Solano County Roadway Preservation: Pave Midway Road with a 1.5" thickness of HMA with geosynthetic pavement interlayer from 250' West of Lewis Road to Porter Road/Midway Intersection. Perform dig-out repairs and place leveling course of 3/8". Solano County Farm to Market Phase 3: Construct 4-foot paved shoulders, install HMA leveling course, and install a polymer modified asphaltic emulsion chip seal with a micro-surface on Mankas Corner Road (Abernathy Road to 1000' E of Abernathy Road), and Suisun Valley Road (Rockville Road to Ledgewood Road). Construct 4-foot paved shoulders, install HMA leveling course, and pave with a 1.5" thickness of HMA with geosynthetic pavement interlayer on Abernathy Road (Rockville Road to Mankas Corner Road) and Rockville Road (Suisun Valley Road to Abernathy Road). Stripe all roads with thermoplastic markings. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |