Similar Projects
Waxpool Crossing
New Construction - 17,000 SF
Conception
Ashburn, VA

Juniper Hill Commons
New Construction, Renovation
Conception
Harrisonburg, VA 22801

Cedera - Age Restricted Community
New Construction
Design
Chesapeake, VA

Construction of Broad Rock Sports Complex Basketball Court Relocation
Term Contract
Bidding
Richmond, VA 23224

New River Trail Extension - Phase 1
Post-Bid
$1,000,000 to $9,000,000 est. value
Pulaski, VA 24301

Design-Build Services for Mill Mountain Park Design and Pond Rehabilitation Services
Post-Bid
Roanoke, VA 24011

Historic Fulton Park - New Construction
Results
Richmond, VA

Splash Pad Design and Installation
Results
Less than $100,000 est. value
Front Royal, VA

Services For Replacement of the Powhatan Springs Skatepark and Associated Amenities
Renovation - 19,000 SF
Construction
$2,000,000 est. value
Arlington, VA

Preston Lake Luxury Apartments
New Construction
Construction
Harrisonburg, VA

St Elizabeth's Apartments
New Construction
Pending Verification
Richmond, VA 23222

Manakin Towne Center
New Construction, Demolition - 92,000 SF
Conception
$100,000,000 est. value
Manakin, VA 23103

Widewater State Park - Complete Phase 1 Development
Post-Bid
Stafford, VA 22554

RFQ #19-0529 Three Trails for Chet Hobert Park
Results
Berryville, VA 22611

Dawson Creek Park Renovations
Construction
Arlington, VA

Last Updated 11/18/2019 08:21 AM
Project Title

Renovation of the Mount Vernon Community School Playground

Physical Address View project details and contacts
City, State (County) Alexandria, VA   (Alexandria City County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Project will directly support ACPS and its students by providing a developmentally appropriate, nature based play and outdoor learning space compliant with and exceeding the 2010 ADA, and safety improvements that allow for physical, social, emotional and cognitive development opportunities for students and the local community. The scope of the work is for the renovation of the Mount Vernon Community School playground in accordance with an approved Grading Plan and Construction documents which include, but is not limited to demolition and removal of existing playground equipment (as indicated) , mulch and rubber surfacing, fencing, timber edging, concrete sidewalks and steps, retaining wall, and landscaping (as indicated). The work also includes narrowing a sidewalk and the removal of concrete planters. According to the construction documents the work will include but is not limited to grading, permeable surfacing, tree protection, site work, playground equipment, poured in place surfacing, retaining wall construction, fence installation, and drainage preparation for surfacing. The installation of locking storage, landscape boulders, seating, and picnic tables is also part of the project.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents