Similar Projects
Franklin, Monroe, and John Street Paving
Infrastructure
Bidding
$3,841,000 est. value
Mount Angel, OR

Pringle Elementary School
Addition, Demolition, Alteration
Post-Bid
Salem, OR

2022 Silverton Overlay Project
Infrastructure
Post-Bid
Silverton, OR 97381

Fuel Pad Parking Cover Central Oregon Unit Training and Equipment Site
Renovation, Alteration
Results
$265,000 to $310,000 est. value
Salem, OR 97301

I-5: Aurora-Donald Interchange (Exit 278), Phase 1(A) Project On The Pacific Highway (Rt. No. I-5) Near Aurora
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
OR

OR99E Salem Parkway (072) MP0 - MP5 Crack Sealing
Infrastructure
Post-Bid
Salem, OR 97317

Asphalt Concrete Resurfacing of Various Marion County Roads
Infrastructure
Results
$500,000 to $2,500,000 est. value
Salem, OR 97317

West Hayes Street Improvements
Infrastructure
Post-Bid
Woodburn, OR 97071

River Road South Willamette River (Independence) Bridge
New Construction, Infrastructure
Results
$2,508,700 est. value
Salem, OR 97317

Water Improvements Pavement Repair
Infrastructure
Post-Bid
$150,000 to $250,000 est. value
Detroit, OR 97342

2022 Slurry Seal
Infrastructure
Results
Salem, OR

I-5 Deck Seals
Infrastructure
Results
Salem, OR 97301

2022 Overlay Paving Project
Infrastructure
Results
$160,000 est. value
Saint Paul, OR

Evans Haven project
Infrastructure
Results
$200,000 est. value
Gates, OR 97346

2022 Jefferson Street Improvement Project
Infrastructure
Results
$300,000 est. value
Stayton, OR 97383

Reported 07/07/2022 12:00 AM
Project Title

2022 Project Work - Astoria, Forest Grove and Tillamook Districts

Physical Address View project details and contacts
City, State (County) Salem, OR   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish all equipment and labor to perform road construction or improvement, road brushing, road maintenance, rock quarry development, stream enhancement, site preparation, soil stabilization, water runoff control measures, rock crushing, rock stockpiling, road vacating, or other similar work, including any combination of such work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents