Similar Projects
Pump Station 345 Aragona Witchduck Force Main Replacement
Post-Bid
Virginia Beach, VA 23456

Construction of Columbus Loop Tanks Valve and Site Improvements Phase II
Post-Bid
Virginia Beach, VA 23462

Construction of Little Island Park Pump Station 654 Gravity Sewer Force Main System Improvements
Results
Virginia Beach, VA 23456

Burton Station Sanitary Sewer Pumping Station #370
Results
$130,000 est. value
Virginia Beach, VA 23456

False Cape State Park Residence Alternate Septic System Sod Replacement
Post-Bid
$500,000 to $749,999 est. value
Virginia Beach, VA 23456

Annual Services Contract 7 for Taps and Laterals Installation
Term Contract
Results
Less than $600,000 est. value
Virginia Beach, VA 23456

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Annual Services Contract for Sanitary Sewer Wet Well Cleaning
Term Contract
Results
Virginia Beach, VA 23456

Hampton Trunk A and B Replacement - Jefferson Avenue to Walnut Avenue
Results
Less than $12,989,160 est. value
Virginia Beach, VA 23455

False Cape State Park Water System and Wash Woods Well Repairs
Results
Virginia Beach, VA 23456

Thermal Mass Flow Meters - ATP
Results
Virginia Beach, VA 23454

Eastern Shore Infrastructure Improvements -Transmission Force Main Phase I
Results
Virginia Beach, VA

Utility Locating Services
Results
$1,000,000 to $2,999,999 est. value
Virginia Beach, VA

Regency Drive Sanitary Sewer Replacement
Results
Virginia Beach, VA 23454

Rosemount Flow Meters - YRTP
Infrastructure
Results
Seaford, Virginia Beach, VA 23696

Last Updated 08/25/2021 05:00 PM
Project Title

Pembroke Meadors Water Distribution System Replacement and Sanitary Sewer Replacement/Rehabilitation Phase 1

Physical Address View project details and contacts
City, State (County) Virginia Beach, VA   (Virginia Beach City County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes installing approximately 3,150 feet of 4-inch, 4,100 feet of 6-inch, 7,060 feet of 8-inch, and 500 feet of 10-inch ductile iron water pipe; replace all fire hydrants, valves, and air vents; install 4-inch blow-off valves; replace all water service lines and old meter boxes; abandon existing water main; install approximately 25 feet of 4- inch and 610 feet of 6-inch ductile iron sewer force main pipe; replace all air vents; abandon existing 6-inch ductile iron force main; replace approximately 630 feet of gravity sewer with 8-inch PVC pipe and 100 feet of gravity sewer with 8-inch ductile iron pipe; replace approximately 900 feet of sewer laterals with 4-inch PVC and install new sewer clean out; replace 2 sewer manholes; replace one inside drop connection; rehab manholes; and CCTV new gravity sewer main and laterals.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents