Similar Projects
Water Main Replacement Program - Taft Street To Sherdian Street - City Of Hollywood
Infrastructure
Conception
$7,035,000 est. value
Hollywood, FL 33026

Waves Dania Beach Mixed-Use
New Construction, Infrastructure - 1,300,000 SF
Design
$200,000,000 CJ est. value
Dania Beach, FL 33004

Arthur Street Multifamily
New Construction, Infrastructure - 13,783 SF
Design
$2,300,000 CJ est. value
Hollywood, FL 33020

Richard E. Giusti Heart Par Cours Park Improvements
Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Oakland Park, FL 33334

Holiday Inn FTL / Fort Lauderdale
New Construction, Infrastructure
Post-Bid
$10,200,000 CJ est. value
Fort Lauderdale, FL 33316

Hollywood Boulevard Mixed Use / Hollywood
New Construction, Infrastructure - 290,712 SF
Post-Bid
$22,000,000 CJ est. value
Hollywood, FL 33020

River Oaks Stormwater Improvements (P11868)
Infrastructure
Results
$22,093,982 CJ est. value
Fort Lauderdale, FL 33301

River Oaks Stormwater Improvements (P11868)
Infrastructure
Results
$22,093,982 CJ est. value
Fort Lauderdale, FL 33301

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Millennium Townhouses
New Construction, Infrastructure - 10,916 SF
Construction
$4,000,000 CJ est. value
Fort Lauderdale, FL 33305

RFQ - Redevelop the Existing East and West Buildings of the Fort Lauderdale Aquatic Complex
Demolition, New Construction, Infrastructure
Pending Verification
$70,900,000 CJ est. value
Fort Lauderdale, FL 33316

New River Central
New Construction, Infrastructure - 5,697 SF
Pending Verification
$125,000,000 CJ est. value
Fort Lauderdale, FL 33301

Atria
Demolition, LEED Certification, New Construction, Infrastructure - 54,600 SF
Design
$35,000,000 CJ est. value
Hollywood, FL 33020

Sixth and Rio
New Construction, Infrastructure - 7,969 SF
Post-Bid
$37,000,000 CJ est. value
Fort Lauderdale, FL 33301

New Raw Water Supply Line (Between Water Treatment Plant and Eastern Wellfield)
Infrastructure
Results
$3,000,000 est. value
Hollywood, FL 33024

Last Updated 07/20/2023 09:39 AM
Project Title

Water System Improvement - Phase 1 (Location 2 Sunrise on the Green)

Physical Address View project details and contacts
City, State (County) Sunrise, FL 33351   (Broward County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,230,547 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work for this location consists of, but is not limited to a water main replacement project which includes clearing and grubbing, maintenance of traffic, open cut installation of 6", 8" and 10" ductile iron water main pipe, installation of 8" and 10" High Density Polyethylene (HDPE) pipe by the directional drill method, installation of valves, fittings and fire hydrants, replacement of 2" water service pipe with HDPE pipe by open cut and pipe bursting, replacement of water meters and assemblies, connection to an existing 12" DIP water main at two locations, limited milling and repaving, trench pavement restoration, sod restoration, existing 6" PVC pipe abandonment, water main testing, and other miscellaneous items to provide a complete water main replacement of the existing system. The project work also includes preparation of as-built record drawings and all work required to certify the new system and place the new mains into service. The existing water system must remain in service until the replacement system construction is completed and released for operation. The existing water services will be replaced and service transferred to the new system with the least possible disruption to the existing water customers transferred to the new system with the least possible disruption to the existing water customers, as shown and specified in the Bid documents. Deadline for Questions Day/Date: Tuesday, May 16, 2023 Time: 12:00 Noon. Bid bond Bid(5%)

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents