Similar Projects
3900 Alton
New Construction, Build-Out - 197,780 SF
Conception
$10,000,000 CJ est. value
Miami Beach, FL 33140

Varadero
New Construction - 2,456,798 SF
Conception
$10,000,000 CJ est. value
Sunny Isles, FL

The Towers
New Construction
Design
$10,000,000 CJ est. value
Miami, FL 33131

7918 West Drive
New Construction - 99,078 SF
Design
$5,000,000 to $10,000,000 CJ est. value
North Bay Village, FL

Wynwood Works
New Construction
Bidding
Miami, FL 33127

Prequalification for the NMCRA Residential Rehabilitation Construction Program
Renovation
Post-Bid
North Miami, FL

PHCD Work-Order Contract 2021 - North Area
Renovation
Post-Bid
$3,480,000 est. value
FL

Work Order Contract 2020-South Area
Results
Less than $2,300,000 est. value
FL

Work Order Contract 2020- Central Area
Results
Less than $2,500,000 est. value
Miami, FL

The Watermark at Merrick Park
New Construction - 256,917 SF
Construction
$21,500,000 est. value
Coral Gables, FL 33146

River Landing Shops and Residences
New Construction - 1,600,000 SF
Construction
$425,000,000 est. value
Hialeah, Miami, FL 33010

Ritz Carlton Condo Tower
New Construction
Pending Verification
Miami Beach, FL 33139

Sabal Palm Village at Flagler Trail
New Construction, Build-Out - 500,000 SF
Conception
$10,000,000 CJ est. value
Miami, FL

Indian Creek Apartments
New Construction, Renovation, Addition
Design
Miami Beach, FL

Paseo Urbano 41
New Construction - 37,000 SF
Post-Bid
$6,811,351 est. value
Miami, FL 33142

Last Updated 10/21/2021 10:09 AM
Project Title

Toll Brothers FIU

Physical Address View project details and contacts
City, State (County) Miami, FL   (Miami-Dade County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method
Project Status Construction Commenced October 2021, Construction Completion Expected October 2024, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value Greater than $49,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Apartments/Condominiums, 764,030 SF New Construction 293 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents