Similar Projects
Clermont Distilling Co
New Construction
Conception
$13,400,000 est. value
Clermont, KY 40110

Copper Company Manufacturing Plant
New Construction
Conception
$250,000,000 est. value
Shelbyville, KY 40065

Waterfront Park Expansion - Phase IV - Louisville Metro Government
Addition, Infrastructure
Design
$50,000,000 CJ est. value
Louisville, KY 40202

Waterfront Park Expansion - Phase IV - Louisville Metro Government
Addition, Infrastructure
Design
$50,000,000 CJ est. value
Louisville, KY 40202

RFQ D/B - Design-Build Construction of USDA, Forest Service, Daniel Boone National Forest, London Ranger District Office Compound
Demolition, LEED Certification, New Construction, Infrastructure - 7,500 SF
Bidding
$5,400,000 CJ est. value
London, KY 40744

Barkley Dam Site Water Supply Line Replacement
Infrastructure
Bidding
$1,000,000 CJ est. value
Grand Rivers, KY 42045

Manufacturing Facility
New Construction - 500,000 SF
Post-Bid
Elizabethtown, KY

Site Improvements
Post-Bid
Berea, KY

Distribution System Site Development
Renovation
Results
Burgin, Harrodsburg, KY 40330

Site Clearing
Results
Covington, Taylor Mill, KY 41015

T. Marzetti Food Manufacturing Facility
Addition - 184,500 SF
Construction
$133,000,000 est. value
Horse Cave, KY 42749

Brown-Forman Expanding Louisville Distillery Operation
New Construction - 896,465 SF
Construction
$95,000,000 est. value
Louisville, KY

Old New Cut Road Apartments
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Fairdale, KY 40118

Blackburn Avenue Multi-Residential Development
New Construction, Infrastructure - 24,816 SF
Pending Verification
$6,000,000 CJ est. value
Lexington, KY 40508

House Foods America Corp Manufacturing Plant
New Construction - 350,000 SF
Conception
$146,300,000 est. value
Louisville, KY

Last Updated 08/23/2022 01:33 PM
Project Title

Langley Bullock Industrial Development / Hebron

Physical Address View project details and contacts
City, State (County) Hebron, KY 41048   (Boone County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $123,510,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work and new construction of a 230,000 square foot industrial development. As of August 23, 2022, a general contractor has been selected. A firm construction timeline has not yet been released

Details

230,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents