Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Public Safety Training Center Makeup-Air Units (MAU) and Exhaust Replacement
Alteration
Bidding
$650,000 est. value
Clackamas, OR 97015

HVAC Equipment Replacement
Alteration
Bidding
$25,000 to $50,000 est. value
Kimberly, OR 97848

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Filters, Installation and Coil Cleaning Services
Alteration
Results
$245,000 est. value
Hillsboro, OR

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

ODF HVAC Direct Digital Control System Upgrade Project: Salem Campus and Tillamook Forest Center
Alteration
Bidding
$500,000 est. value
Salem, OR

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Linn-Benton Community College Main Campus Takena Remodel Project
Alteration
Results
Albany, OR 97321

Schiller Way Vent and Roof Rehabilitation
Alteration
Bidding
$275,000 est. value
Portland, OR 97266

Residential HVAC Contractors
Term Contract
Post-Bid
OR

Design-Build for Mechanical or HVAC
Alteration
Results
Springfield, OR 97477

Pioneer Village HVAC Project
Alteration
Bidding
$400,000 est. value
Salem, OR 97304

Medford School District MSDEC Annex HVAC Upgrades
Renovation
Post-Bid
Medford, OR 97501

Reported 06/15/2022 05:34 AM
Project Title

Lookout Point Powerhouse Heat Pump Ventilation

Physical Address View project details and contacts
City, State (County) Lowell, OR 97452   (Lane County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Pre-Solicitation, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The intent of the Lookout Point Powerhouse Heat Pump Ventilation project is to create a closed HVAC system within the control room. The current HVAC system at times draws in fumes from other parts of the powerhouse into the control room. The Project is looking to disconnect the control room from the main powerhouse HVAC, as well as maintain a positive pressure in the control room. There will be no electrical work associated with this project. USACE personnel will provided electrical connection after project completion. This is a construction project that will include the Installation of a Government furnished heat pump, installation of new ducting, demolition of existing ducting, and asbestos abatement. Lookout Point Powerhouse Heat Pump Ventilation will include to the following items: o Demolition and sealing of existing HVAC ducting. This work includes OSHA "Class I asbestos work" pertaining to the complete removal of asbestos-containing thermal system insulation on all existing ducting and acoustic wall paneling that is modified or demolished during work. New HVAC ducting mentioned above will be tied into the existing ducting. o Installation of a Government furnished heat pump, weighing approximately 500 lbs, on the roof of the powerhouse. This will include the creation of a roof penetration, installation of a waterproof curb, installation and routing of new HVAC ducting, Installation of fire/smoke dampers within ducts penetrating walls, connection of new ducting to heat pump, mounting, and supports. Testing of all installed components to include testing and balancing (TAB) of the Government furnished heat pump

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents