Similar Projects
Construction of a Right Turn Lane on SR 10 Bu at US 78/SR 1
Infrastructure
Bidding
$3,000,000 est. value
Monroe, GA

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

South Madison Avenue Resurfacing
Results
Less than $350,000 est. value
Monroe, GA 30655

Piedmont Parkway Extension
Results
Monroe, GA 30655

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

C S Floyd Paving Project
Results
Loganville, GA 30052

2021 LMIG Project
Results
Mount Vernon, GA

2021 Milling and Deep Patching
Results
Monroe, GA

6.322 Miles of Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 74 Beginning West of SR 7 and Extending East of SR 42
Results
Monroe, GA

12.503 Miles Of Milling, Inlay And Plant Mix Resurfacing
Infrastructure
Results

FY 2020 CDBG Storm Drainage and Street Improvements
Infrastructure
Results
Monroe, GA

Last Updated 04/29/2022 05:58 AM
Project Title

T32-D1-PavePres-Walton SR 186-131252

Physical Address View project details and contacts
City, State (County) GA   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Perform prep work, removal, installation and cleanup for Pavement Preservation and Maintenance Services defined in this ITB. The majority of the work will occur on the Interstate and State Route system. The Contractor shall supply labor, equipment, tools, means of transportation, traffic control, and incidentals to perform work in accordance to specifications

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents