Similar Projects
Blue Heron Landing Park
Renovation, Demolition, Infrastructure, Alteration
Bidding
Less than $775,000 est. value

Interchange Improvements
Infrastructure
Bidding
VA

Auto Mitsubishi Dealership -Sitework
Alteration
Post-Bid
Manassas, VA 20111

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

D/B - I-95 and Route 123 (Exit 160) Interchange Improvements
Infrastructure
Bidding
$200,000 est. value
Gainesville, VA

2021 Latex Modified
Results
Less than $2,009,000 est. value
VA

Plant Mix 2021
Results
Less than $3,862,000 est. value
VA

2021 Plant Mix
Results
Less than $2,848,000 est. value
VA

Interstate Auxiliary Lane Addition
Results
Less than $28,000,000 est. value
VA

2021 Plant Mix
Results
Less than $2,400,000 est. value

2021 Plant Mix
Results
Less than $4,990,000 est. value
VA

2021 Plant Mix
Results
Less than $4,990,000 est. value
VA

2021 Plant Mix
Results
Less than $5,529,000 est. value

Last Updated 04/26/2022 10:41 AM
Project Title

Fraley Boulevard Widening Project - Right of Way, Utility, and Geotechnical Services

Physical Address View project details and contacts
City, State (County) Dumfries, VA   (Prince William County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency - 09/17/21
Owner View project details and contacts
Architect View project details and contacts
Description

The Fraley Boulevard Widening Project will widen about two miles of Fraley Boulevard (Route 1, primarily in the Town of Dumfries) to three lanes in each direction between Brady’s Hill Road and Route 234 (Dumfries Road) with pedestrian and bike facilities on the current Northbound alignment. Currently in the Town of Dumfries, northbound Route 1 traffic is routed along the two-lane Fraley Boulevard roadway, and southbound Route 1 traffic is routed along Main Street. This project will add through lanes to Fraley Boulevard, to convert the facility to three lanes of traffic in each direction with a raised median, and as a result, Main Street will be converted to two-way local traffic via new pavement markings. The Project scope of work includes, but is not limited to, ROW acquisition, utility test pitting, subsurface utility engineering, geotechnical services, and land surveying. Consultant shall attend regular bi-weekly project progress meetings with PWCDOT and the County’s road designer. The Consultant shall also attend public information meetings, stakeholder involvement meetings, public hearings, and public engagement/outreach at various project milestones in coordination with PWCDOT.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents