Similar Projects
RFQ - Deck Replacement and Superstructure Replacement of Structures carrying IL 23/IL 71 (State Street) over the Illinois River and an Access Road, and a Parking Lot Entrance
Infrastructure
Design
$8,000,000 CJ est. value
Ottawa, IL 61350

RFQ - IL 137 at Bull Creek (S of Wadsworth Road), Phase III Project
Term Contract
Design
Beach Park, IL 60099

Roadway and Bridge Reconstruction and Widening
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
South Holland, IL 60473

Deck Repair, Microsilica Overlay and Miscellaneous Repair on Sn 004-0017 Carrying US 20
Renovation, Infrastructure
Bidding
$4,000,000 est. value
Belvidere, IL 61008

Lincoln Yards - Dominick Bridge
New Construction
Post-Bid
$35,000,000 est. value
Chicago, IL 60601

Skyway 75th Avenue Bearing Pedestal
Renovation
Post-Bid
Chicago, IL 60707

Bridge Removal and Replacement of SN 018-0028
Results
IL

Webster Avenue Bridge Over the North Branch of the Chicago River
Results
Chicago, IL

Bridge Bearing Replacements on Two I-72
New Construction, Infrastructure
Bidding
$4,000,000 est. value
Springfield, IL 62761

I-19-4449 I-294 Roadway and Bridge Widening and Rehabilitation
Post-Bid
Downers Grove, IL

Gregory Street Culvert Rehabilitation
Results
Normal, IL 61761

Deck Patching on Sn 059-0042 Carrying TR 457
Renovation
Bidding
$4,000,000 est. value
Mount Olive, IL

Culvert Liners
Renovation
Post-Bid
Congerville, Roanoke, IL

RR-20-4555 Bridge Replacement Tri-State Tollway (I-294) Plainfield Road Over I-294 and Flagg Creek
New Construction
Results
Downers Grove, IL

TR 243 Bridge Replacement & Approach Roadway
Renovation
Post-Bid
Nashville, IL

Last Updated 07/22/2022 06:01 AM
Project Title

RFQ - Various Phase II District One Sign and Tower Structure Inspection Projects, Various Routes

Physical Address View project details and contacts
City, State (County) Springfield, IL 62703   (Sangamon County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Job No. D-60-002-23, Various Phase II District One Sign and Tower Structure Inspection Projects, Various Routes, Various Counties, Bureau of Operations. This project requires 21% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 26, 2022, at 1:00 PM at the Central Bureau of Operations Office in Springfield. Phase II engineering services are required for the inspection of sign and tower structures and for the collection of data and the development of reports. Work orders under the blanket agreement will be negotiated and authorized by the department on an as-needed basis. The estimated engineering fee for this project is $250,000. The completion date for this contract will be 36 months after authorization to proceed. The Prime firm must be prequalified in the Structures (Highway: Typical) category to be considered for this project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 049 - RFQ - Various Phase II District One Sign and Tower Structure Inspection Projects, Various Routes

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents