Similar Projects
Concrete Repairs and Maintenance
Term Contract
Design
Sanger, CA 93657

2022 Pavement Maintenance Project
Infrastructure
Bidding
$1,350,000 CJ est. value
Bel Tiburon, CA 94920

Transit Maintenance Facility, Phase V - Entrance Gate Construction
Infrastructure
Bidding
$459,903 CJ est. value
Santa Clarita, CA 91321

Concrete Pad Installation - CHP Contra Costa
Alteration
Post-Bid
Martinez, CA

Concrete Repair Program - Phase XI
Infrastructure, Alteration
Post-Bid
$169,000 est. value
West Hollywood, CA 90069

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

General Engineering (A License) Construction, San Joaquin, Stanislaus, and Tuolumne Counties, Hetch Hetchy
Infrastructure, Alteration
Results
$5,000,000 est. value
San Joaquin, CA 93660

Tehipite Middle School New E-Sports Arena
New Construction, Infrastructure
Bidding
$3,283,000 CJ est. value
Fresno, CA 93701

Concrete Cutting Services
Term Contract
Post-Bid
zh, CA 93510

Construction of Concrete Improvements in Residential Streets
Alteration
Results
Cerritos, CA

Centennial High School: ESSER III Roofing and HVAC
Renovation
Bidding
$8,300,000 CJ est. value
Bakersfield, CA 93312

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Place Minor Concrete and Highway Plants
Alteration
Results
$3,850,000 est. value
Los Angeles, CA 90081

Cedarcreek Elementary School CDP Playground and Parking Lot Paving
Infrastructure
Bidding
$500,000 CJ est. value
Santa Clarita, CA 91351

Annual Residential Street Rehabilitation Project (Phase 2B)
Term Contract
Post-Bid
Compton, CA 90221

Last Updated 05/23/2023 09:03 AM
Project Title

Nacimiento-Fergusson Road

Physical Address View project details and contacts
City, State (County) King City, CA 93930   (Monterey County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,939,384 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

THIS IS A REQUEST FOR BIDS. PLANS AND SPECIFICATION ARE AVAILABLE AT THIS TIME. CA ERFO FS LSPDR 2021-1(1), HFLCEO230081PR The project is located approximately 33 miles southwest of King City, CA on Forest Service Route 22S01 (Nacimiento Fergusson Road) within the Los Padres National Forest in Monterey, CA. The project consists of repairing 13 sites, encompassing 11 miles along the route. Site repairs generally include embankment construction, retaining walls, and culvert replacements. SCOPE OF THE WORK: The purpose of the project is to repair 13 damaged sites along the Nacimiento Fergusson Road within the Los Padres National Forrest. 7 mechanically stabilized earth (MSE) walls and 8 drainage culverts are proposed as part of the repair design. Culverts range in size from 24-inch to 72-inch in diameter. Headwalls and wingwalls are proposed on the 72-inch culverts. Furthermore, as a result of the flood event, debris removal and grading are anticipated. Nacimiento Fergusson Road is currently paved and is proposed to be repaved with the existing pavement structural section within the repair sites. Items worth noting: *The terrain is mountainous with steep slopes. *The roadway widths vary from 16-ft to 24-ft. *The road is currently closed to the public. However, residents along the route do have access. *The roadway serves as the primary route between King City and the Pacific Coast. *Access for the residents will be maintained during construction. *Shoring is anticipated for MSE wall excavations and to allow access. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 2,500 CUYD of Excavation/Embankment Construction 2,200 SQFT of Mechanically Stabilized Earth wall 220 CUYD of Riprap 700 TON of Roadway Aggregate 650 TON of Asphalt Pavement 3 EACH of Concrete Headwall 150 LNFT of 24-inch Culvert 80 LNFT of 36-inch Culvert 150 LNFT of 78-inch Culvert 110 LNFT of 72-inch Culvert 9 EACH End Section for Culverts 120 hours of Equipment Hours 1 (LPSM) Traffic Control ANTICIPATED SCHEDULE: Award: May 2023 Construction: May 2023 - December 2023 ESTIMATED COST RANGE: The anticipated cost range is between $10,000,000 and $20,000,000. 10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS: ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH: 1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR) 2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES 3. SPECIAL CONTRACT REQUIREMENTS 4. PLANS 5. BID SCHEDULE 6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14, U.S. CUSTOMARY UNITS See Subsection 104.04 of the FP-14 for governing order of precedence The price range of the project work is between $5,000,000 and $10,000,000. TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON April 24, 2023 Questions can be submitted to CFLContracts@dot.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents