Last Updated | 05/23/2023 09:03 AM |
Project Title | Nacimiento-Fergusson Road |
Physical Address | View project details and contacts |
City, State (County) | King City, CA 93930 (Monterey County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,939,384 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | THIS IS A REQUEST FOR BIDS. PLANS AND SPECIFICATION ARE AVAILABLE AT THIS TIME. CA ERFO FS LSPDR 2021-1(1), HFLCEO230081PR The project is located approximately 33 miles southwest of King City, CA on Forest Service Route 22S01 (Nacimiento Fergusson Road) within the Los Padres National Forest in Monterey, CA. The project consists of repairing 13 sites, encompassing 11 miles along the route. Site repairs generally include embankment construction, retaining walls, and culvert replacements. SCOPE OF THE WORK: The purpose of the project is to repair 13 damaged sites along the Nacimiento Fergusson Road within the Los Padres National Forrest. 7 mechanically stabilized earth (MSE) walls and 8 drainage culverts are proposed as part of the repair design. Culverts range in size from 24-inch to 72-inch in diameter. Headwalls and wingwalls are proposed on the 72-inch culverts. Furthermore, as a result of the flood event, debris removal and grading are anticipated. Nacimiento Fergusson Road is currently paved and is proposed to be repaved with the existing pavement structural section within the repair sites. Items worth noting: *The terrain is mountainous with steep slopes. *The roadway widths vary from 16-ft to 24-ft. *The road is currently closed to the public. However, residents along the route do have access. *The roadway serves as the primary route between King City and the Pacific Coast. *Access for the residents will be maintained during construction. *Shoring is anticipated for MSE wall excavations and to allow access. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 2,500 CUYD of Excavation/Embankment Construction 2,200 SQFT of Mechanically Stabilized Earth wall 220 CUYD of Riprap 700 TON of Roadway Aggregate 650 TON of Asphalt Pavement 3 EACH of Concrete Headwall 150 LNFT of 24-inch Culvert 80 LNFT of 36-inch Culvert 150 LNFT of 78-inch Culvert 110 LNFT of 72-inch Culvert 9 EACH End Section for Culverts 120 hours of Equipment Hours 1 (LPSM) Traffic Control ANTICIPATED SCHEDULE: Award: May 2023 Construction: May 2023 - December 2023 ESTIMATED COST RANGE: The anticipated cost range is between $10,000,000 and $20,000,000. 10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS: ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH: 1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR) 2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES 3. SPECIAL CONTRACT REQUIREMENTS 4. PLANS 5. BID SCHEDULE 6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14, U.S. CUSTOMARY UNITS See Subsection 104.04 of the FP-14 for governing order of precedence The price range of the project work is between $5,000,000 and $10,000,000. TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON April 24, 2023 Questions can be submitted to CFLContracts@dot.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |