Similar Projects
Store-It Right Storage Facility / Pabst Farms Commerce Center
New Construction, Infrastructure - 122,000 SF
Design
$13,000,000 CJ est. value
Oconomowoc, WI 53066

Maple Centre - Phase 2
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Mukwonago, WI 53149

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

2022 Road Program, Contract 1-2022
Infrastructure
Post-Bid
$418,839 CJ est. value
Brookfield, WI 53005

Commercial Lead and Lateral Replacement
Infrastructure
Results
Menomonee Falls, WI

CTH VV (Main Street) and Plainview Road Water Main
Infrastructure
Results
$927,516 est. value
Sussex, WI 53089

National Heritage Academies / Waukesha
New Construction, Infrastructure - 45,000 SF
Construction
$9,500,000 CJ est. value
Waukesha, WI 53189

ABB Inc. Headquarters
New Construction, Infrastructure - 301,320 SF
Construction
$161,000,000 CJ est. value
New Berlin, WI 53146

Atlas Metals Parts Co Expansion
Addition, New Construction, Infrastructure - 4,900 SF
Pending Verification
$260,000 CJ est. value
Waukesha, WI 53186

Brookfield Square Mall
Demolition, New Construction, Infrastructure - 370,000 SF
Pending Verification
$81,000,000 CJ est. value
Brookfield, WI 53005

Maple Centre - Phase 1
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Mukwonago, WI 53149

2022 Water Main Relay
Infrastructure
Post-Bid
Brookfield, WI

Chippewa Drive Water Main Relay, Storm Sewer and Street Reconstruction
Infrastructure
Results
Menomonee Falls, WI 53051

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Tower Ridge Apartments
New Construction, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Oconomowoc, WI 53066

Last Updated 06/01/2023 03:39 PM
Project Title

Woodside Water Tower Riser Pipe Replacement 2023

Physical Address View project details and contacts
City, State (County) Sussex, WI 53089   (Waukesha County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

City: Sussex County: Waukesha State/Province: WI Project Details Closing Date: Thu, 06/01/2023 02:00 PM CDT Bids submitted after this time will not be accepted. Bids will be opened and publicly read aloud immediately after specified closing time. Interested parties are invited to attend. If a Bid is received by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation, "BID ENCLOSED - Woodside Water Tower Riser Pipe Replacement 2023", and the name and address of the Bidder must be marked on the outside of the envelope. Project Category Code: Water Tower Rehabilitation and Repair Description: The proposed construction consists of replacement of the 12" interior riser pipe in the Woodside Tower located at N75 W23416 Water Tower Court. The tower is a 250,000-gallon elevated Waterspheroid Tank by Horton Pedestal Tank constructed by CBI Na-Con, Inc. in 1987/1988. The tank is 114'-5" high from ground level to highest projection. The riser pipe shall be replaced from the thrust elbow in the vault below grade to approximately 1'6" (18 inches) into the sphere, including replacement of the expansion joint, bracing, sample taps, and silt stop assembly. The new pipe shall be insulated to prevent freezing. Remove and replace existing steel riser pipe and replace with a new schedule 40 steel riser pipe with insulating jacket, expansion joint and associated accessories. Project is to be ready for Substantial Completion on or before Monday, October 20, 2023. Project is to be ready for Final Completion on or before Monday, November 10, 2023 Question Deadline 05/29/2023 Information / Clarification shall be submitted in writing by Email.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents