Similar Projects
Last Updated | 06/01/2023 03:39 PM |
Project Title | Woodside Water Tower Riser Pipe Replacement 2023 |
Physical Address | View project details and contacts |
City, State (County) | Sussex, WI 53089 (Waukesha County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Storage/Water Tanks, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $800,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | City: Sussex County: Waukesha State/Province: WI Project Details Closing Date: Thu, 06/01/2023 02:00 PM CDT Bids submitted after this time will not be accepted. Bids will be opened and publicly read aloud immediately after specified closing time. Interested parties are invited to attend. If a Bid is received by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation, "BID ENCLOSED - Woodside Water Tower Riser Pipe Replacement 2023", and the name and address of the Bidder must be marked on the outside of the envelope. Project Category Code: Water Tower Rehabilitation and Repair Description: The proposed construction consists of replacement of the 12" interior riser pipe in the Woodside Tower located at N75 W23416 Water Tower Court. The tower is a 250,000-gallon elevated Waterspheroid Tank by Horton Pedestal Tank constructed by CBI Na-Con, Inc. in 1987/1988. The tank is 114'-5" high from ground level to highest projection. The riser pipe shall be replaced from the thrust elbow in the vault below grade to approximately 1'6" (18 inches) into the sphere, including replacement of the expansion joint, bracing, sample taps, and silt stop assembly. The new pipe shall be insulated to prevent freezing. Remove and replace existing steel riser pipe and replace with a new schedule 40 steel riser pipe with insulating jacket, expansion joint and associated accessories. Project is to be ready for Substantial Completion on or before Monday, October 20, 2023. Project is to be ready for Final Completion on or before Monday, November 10, 2023 Question Deadline 05/29/2023 Information / Clarification shall be submitted in writing by Email. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |