Similar Projects
RFQ Contractor - Fire Station Support Building
New Construction, Infrastructure
Conception
$25,000,000 CJ est. value
Fort Carson, CO 80913

RFQ Contractor - Fire Station Support Building
New Construction, Infrastructure
Conception
$25,000,000 CJ est. value
Fort Carson, CO 80913

RFP Construction Manager - ARPA Road Resurfacing Project
Infrastructure
Design
$3,000,000 CJ est. value
Colorado Springs, CO 80903

RFP Construction Manager - ARPA Road Resurfacing Project
Infrastructure
Design
$3,000,000 CJ est. value
Colorado Springs, CO 80903

Super Star Car Wash - Colorado Springs- Razorback and Voyager
New Construction, Infrastructure - 6,576 SF
Bidding
$1,000,000 CJ est. value
Colorado Springs, CO 80920

RFP Construction Manager - Las Vegas and Royer Railroad Crossing Relocation Construction Management
Infrastructure
Bidding
$2,000,000 CJ est. value
Colorado Springs, CO 80903

2020 CDBG Prado Dr and Downtown ADA Improvements
Post-Bid
Fountain, CO 80817

Pioneer Village Road Maintenance Services
Alteration
Post-Bid
Colorado Springs, CO

CO FTBR Crystal Dam (1), East Portal Access Road
Results
$4,500,000 to $5,500,000 est. value
CO

Ada Curb Ramp Retrofit Upgrades, including Removal of Sidewalk
Results
$1,000,000 to $5,000,000 est. value

Hampton Inn
New Construction
Construction
$2,000,000 est. value
Colorado Springs, CO 80900

Falcon Commerce Center
New Construction
Construction
$190,000 est. value
Monument, CO 80921

Victory Ridge Park
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Colorado Springs, CO 80908

Victory Ridge Park
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Colorado Springs, CO 80908

New Fire Station - Tri-Lakes Monument Fire Protection District
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Monument, CO 80132

Last Updated 08/18/2022 04:07 PM
Project Title

Memorial Park Sidewalk and Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80903   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Monument Park Sidewalk & Parking Lot Improvements Buyers Requirements Participation Requirements - Business Concern - Disadvantaged Business Enterprise (DBE) - Minority Business Participation - Native American Participation - Small Business Participation - Service-Disabled Veteran Owned - Women-Owned Business Participation General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % Question Acceptance Deadline 07/29/2022 03:00 PM EDT Questions are submitted online No Bids shall be received on or before: 2:00PM August 18, 2022. A public opening will be held via Microsoft Teams at that time. Web access and dial in information is below: Microsoft Teams meeting Join on your computer or mobile app Click here to join the meeting Or join by entering a meeting ID Meeting ID: 211 358 177 622 Passcode: NA4gyX The City of Colorado Springs (City) is seeking best value bids from qualified, licensed, and experienced contractors to provide all labor, materials, and equipment necessary for construction of the Memorial Park Sidewalk and Parking Lot Improvements Project (Project) for the City of Colorado Springs Department of Public Works (Department) per specifications (Schedules D and E), the attached drawings, the City of Colorado Springs standard drawings, and the Colorado Department of Transportation Standard Specifications (2019). The Project is funded through the following sources: Federal/State (Project No. TRG M240-174 / Project Code: 23056) and the City of Colorado Springs. WORK The Project work generally consists of demolition of existing curb and gutter, sidewalk, pavement, and a gravel parking area followed by the installation of curb and gutter, curb ramps, sidewalk, asphalt patching, permeable paving and storm drainage infrastructure. The project will result in an accessible pedestrian environment along the perimeter of Memorial Park. SCHEDULE The Project contract time is 90 working days.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents