Similar Projects
Highpoint
New Construction - 588,000 SF
Conception
Stuart, FL 34997

Park Street Residences
New Construction - 4,200 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Rio, FL 34957

Positano
New Construction
Design
Fort Myers, FL

Arbor Reserve
New Construction - 72,090 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Davie, FL 33325

Capallia Ship Rehab
Renovation
Bidding
$22,000 est. value
Citra, FL 32113

3708 Brophy Boulevard - Rehabilitation
Post-Bid
Cocoa, FL 32926

Rish Park Manager's Residence & Storage Shed
Post-Bid
Port Saint Joe, FL 32456

Housing Rehabilitation Special Project
Results
Tallahassee, FL 32308

Rebid - SHIP Home Replacement-Hormell
Results
Less than $140,000 est. value
Lecanto, FL 34460

Le Club Resort - Phase I
New Construction
Construction
North Miami Beach, FL

Sierra Ranch
New Construction - 284,400 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Davie, FL

Mattamy Canal Road
New Construction
Pending Verification
Palmetto, FL 34221

Royal Palm Crossing Phase 3
New Construction
Pending Verification
Bradenton, FL 34203

Southern Oaks
New Construction
Conception
Narcoossee, Saint Cloud, FL 34771

Fox Lake Hammock Subdivision
New Construction
Design
Titusville, FL 32796

Last Updated 06/25/2021 02:07 PM
Project Title

The Hammocks at West Port - Phase 1

Physical Address View project details and contacts
City, State (County) Port Charlotte, FL   (Charlotte County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method
Project Status Construction Commenced April 2021
Bids Due View project details and contacts
Estimated Value Greater than $25,557,510
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

110 Single-Family Homes, New Construction, 118.34 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents