Similar Projects
The Fieldhouse
New Construction
Conception
Tallahassee, FL 32304

Saint Augustine Student Housing
New Construction
Conception
Tallahassee, FL

K-12 International Boarding School
New Construction
Design
Panama City, FL 32409

Lynn University Student Housing
New Construction - 126,369 SF
Design
$10,000,000 CJ est. value
Boca Raton, FL 33427

FAMU Student Housing Phase 1A - FINROCK Construction
New Construction - 91,000 SF
Post-Bid
Tallahassee, FL

Programming, Financial Analysis, Design, Construction and Possible Management of Student Housing
Post-Bid
Sanford, FL 32771

Z--Preservation and Stabilization of Engineering Officers` Quarters & Front 4 Curt
Results
Key West, FL

The Seed School Of Miami - Dormitory
New Construction - 22,034 SF
Construction
$20,000,000 est. value
Miami, FL 33010

Tiger Landing Student Housing
Renovation - 27,868 SF
Construction
$3,455,000 est. value
Jacksonville, FL 32209

Legacy at The Standard
New Construction
Conception
Gainesville, FL

Collegiate Village Student Housing - East Parcel
New Construction
Design
Orlando, FL 32817

FAMU Gibbs Hall Dormitory Third Floor Buildout
Build-Out - 4,100 SF
Post-Bid
Tallahassee, FL 32307

The Nine at Tallahassee - Phase II
New Construction, Demolition - 63,238 SF
Construction
$16,000,000 est. value
Tallahassee, FL 32304

InterAmerican University of Puerto Rico
New Construction - 187,000 SF
Design
Orlando, FL 32824

Marshall House Project
Renovation - 1,914 SF
Post-Bid
$400,000 est. value
Clearwater, FL 33755

Last Updated 08/17/2020 09:58 AM
Project Title

Collegiate Village Student Housing - West Parcel

Physical Address View project details and contacts
City, State (County) Orlando, FL 32826   (Orange County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method Qualified Bidding.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Dormitory, New Construction, 366 Unit(s), 13.28 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents