Similar Projects
Page Hall Renovation
Renovation, Alteration - 31,000 SF
Design
Raleigh, NC 27695

Forestry Sciences Laboratory, Research Triangle Park, NC / HVAC Preventive Maintenance
Term Contract
Bidding
Durham, NC 27709

HVAC 40 Ton Package Unit for General Services Warehouse
Alteration
Bidding
Durham, NC

Replace Make-Up Air Units at Durham County Stadium
Post-Bid
Durham, NC 27704

Indoor Air Quality
Post-Bid
Durham, NC 27701

Cooler and Freezer Restoration at Durham County Detention Center
Term Contract
Results
Durham, NC 27701

Administration Building AHU Replacement
Results
$276,915 est. value
Durham, NC 27701

Z2DA--Install Emergency Power for HVAC
Term Contract
Post-Bid
$1,000,000 to $2,000,000 est. value
Durham, NC 27705

Z2DZ--Renovate and Replace Pharmacy AHUs
Results
$1,000,000 to $5,000,000 est. value
Durham, NC 27705

Dabney Hall Phase 3, 8th Floor HVAC Renovations
Alteration
Post-Bid
Raleigh, NC

Design-Build Services for Mechanical (HVAC) upgrades to the Durham Bulls Athletic Park
Results
Durham, NC 27701

Donald W Eaddy Building - HVAC and Lab Exhaust Upgrades and Repairs
Alteration
Post-Bid
$1,600,000 est. value
Raleigh, NC

HVAC Chemical Water and Drain Treatment Services at Durham County Facilities
Results
Less than $30,733 est. value
Durham, NC

Gas Water Heater and HVAC Venting Replacements
Alteration
Post-Bid
Raleigh, NC 27604

HVAC Equipment Maintenance and Repair Services at Various DCO Facilities
Alteration
Results
Durham, NC

Reported 03/21/2022 08:21 AM
Project Title

Mechanical Equipment Replacement Group 5

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Durham County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General scope of work includes: This project shall include the installation of new boilers withassociated pumps and hot water piping distribution to serve Buildings SK and SL with the replacement of one chiller, (CH-2), and the primary and secondary pumps at Building SL. As well as associated controls and electrical work. The project also includes the replacement of electric coils in air handling unit at Building SK and the six air handling units at Building SL. As well the replacement of a 119 gallon domestic water heater at Building SL. The project also includes alternates to replace the electric re-heat terminal units on the first floor of SK, the installation of a third boiler in Building SK, the addition of a maintenance office in the ground floor of Building SK, and the replacement of electric water coolers, lavatory faucets, and mop sink faucets in Buildings SK and SL. A new natural gas generator shall be installed for 100% back-up of building SK.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents