Similar Projects
Replace Roof - Huron Airport Armory
Alteration
Bidding
Huron, SD 57350

Roof Repair and Replacement Project at Various Buildings
Alteration
Bidding
SD

Boys and Girls Club Roof Rehabilitation
Post-Bid
$1,250,000 to $170,000 est. value
Watertown, SD 57201

Reroofing South Park Elementary School
Post-Bid
Belle Fourche, SD 57717

Roofing IDIQ - Plains Area - North
Results
$10,000,000 est. value

Roofing IDIQ - Plains Area - North
Results
$10,000,000 est. value

Courthouse Reroof
Renovation, Alteration
Bidding
Watertown, SD 57201

Brown High School Re-Roof
Post-Bid
Sturgis, SD 57785

Courthouse and Law Department Roof Replacement
Results
Martin, SD 57551

Multi-Family-Housing Unit Harney View Apartment - Exterior Upgrades-Siding, Roofs, Gutters
Alteration
Post-Bid
Rapid City, SD 57701

Brown County Highway Department Roof
Results
Aberdeen, SD 57401

He Sapa College Center Steel Roof, Gutters, and Siding Replacement
Renovation, Alteration
Post-Bid
Rapid City, SD 57701

Cottage Roof Replacement, South Dakota Developmental Center
Results
Redfield, SD 57469

Roof Repair and Water Damages inside the Road Maintenance Shop and Office Areas
Alteration
Post-Bid
Saint Francis, SD 57572

Akeley-Lawrence Science-Replace Roof
Results
Vermillion, SD 57069

Last Updated 03/30/2022 03:18 PM
Project Title

Tatanka Hotshot Base Roof and Gutter Replacement

Physical Address View project details and contacts
City, State (County) Custer, SD 57730   (Custer County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Tatank Hotshot Base Quarters: Remove and replacing existing roof system to deck on the Tatanka Hotshot Base Quarters building. Remove and dispose of existing asphalt shingle roofing system to deck. Inspect deck and flashing and replace/repair rotted or damaged materials prior to installing new roofing system. Provide and install new asphalt shingle roofing system including: 30# felt underlayment; ice dam material on eves, ridges, and rakes; vent jacks; gutter apron; drip edge; ridge vent; and architcutral shingles. Remove and replacing existing gutters and downspouts on the Tatanka Hotshot Base Quarters building. Remove and dispose of existing gutters, hanger, and downspouts. Inspect fascia board replace/repair rotted or damaged materials prior to installing new gutter system. Install new seamless gutters and downspouts, including all necessary hangers, hardware, and caulking to complete the installation (See Section 07630). Tatanka Hotshot Base Pumphouse: Remove and replacing existing roof system to deck on the Tatanka Hotshot Base Pumphouse. Remove and dispose of existing asphalt shingle roofing system to deck. Inspect deck and flashing and replace/repair rotted or damaged materials prior to installing new roofing system. Provide and install new asphalt shingle roofing system including: 30# felt underlayment; ice dam material on eves, ridges, and rakes; vent jacks; gutter apron; drip edge; ridge vent; and architcutral shingles. Remove and replacing existing gutters and downspouts on the Tatanka Hotshot Base Pumphouse. Remove and dispose of existing gutters, hanger, and downspouts. Inspect fascia board replace/repair rotted or damaged materials prior to installing new gutter system. Install new seamless gutters and downspouts, including all necessary hangers, hardware, and caulking to complete the installation (See Section 07630). Black Hills National Forest Supervisor’s Office Cutter Installation Location of the Work: The work for this project is at the Black Hills National Forest, Supervisor’s Office located at 1019 North 5th Street, Custer, South Dakota. Description of the Work: The Contractor will provide all materials and labor necessary to perform the work required on this project. The Contractor shall be responsible for field verifying all dimensions and quatities of materials required before beginning work on this project. The work to be performed shall include: Install new seamless gutters and downspouts on the Supervisor’s Office as shown on Drawings, including all necessary hangers, hardware, and caulking to complete the installation (See Section 07630). Concrete splash blocks placed at discharge end of each downspout.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Shingles and Shakes, Asphalt Shingles, Roof Specialties, Manufactured Gutters and Downspouts.
Division 32 - Exterior Improvements, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents