Similar Projects
Culvert Replacement - IR 74-Culverts FY22
Infrastructure
Post-Bid
OH

Jacking and Boring Services
Infrastructure
Post-Bid

Meadowbrook Avenue Culvert Improvements
Results
$97,670 est. value
Dayton, OH 45415

Congress Run Stream Restoration and Bank Stabilization
Results
Cincinnati, OH

Box Culverts
Infrastructure
Post-Bid

Removal and Replacement of Identified Curb and Catch Basins
Infrastructure
Results
$317,630 est. value
Trotwood, OH 45426

Z--PEVI 200745 - Restore North and South Seawalls at Perry's Victory to Safeguard Site
New Construction, Term Contract
Results
$10,000,000 est. value
Put-in-Bay, OH 43456

Critical Infrastructure and Neighborhood Revitalization
New Construction, Infrastructure
Results
New Holland, OH

Jones Road Slope Repair and Vernon Road Slope Repair
Infrastructure
Results
Martins Ferry, OH 43935

Sugar Camp Road Landslide Repair Project
Infrastructure
Results
Milford, OH 45150

Dillonvale Subdivision Culvert Improvements
Infrastructure
Results
Sycamore, OH

Sheipline Open Ditch
Infrastructure
Results
$36,606,243 est. value
OH

Reconstruction of Colah Ditch
Infrastructure
Results
$37,500 est. value
OH

Pinnacle Park Drive Parts 1 and 2
Infrastructure
Results
$1,314,276 est. value
Grove City, OH

Design-Build Services for the Chagrin River Streambank Stabilization Project at Erie Road Park
Infrastructure
Results
$365,490 est. value
Eastlake, OH 44097

Last Updated 04/07/2023 09:06 AM
Project Title

SR 134 - Culvert Replacement

Physical Address View project details and contacts
City, State (County) Lynchburg, OH 45142   (Highland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $497,105 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

OHDOT - SR 134 - Culvert Replacement IMPROVEMENT OF 0.02 MILE OF S.R. 134 BY REPLACEMENT OF AN EXISTING CMPA WITH A PRECAST CONCRETE BOX CUL VERT AND THE NECESSARY ROADWA Y APPROACH WORK ALONG S.R. 134.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents